ST0301A-LR100923 (2) h___,. .....T_ Consulting Engineering * Geotechnical Engineering * Construction Materials
4-ip FILLIFINCE 3228 Halifax Street, Suite A, Dallas, Texas 75247
oeOTECHr1lCF1L Phone: (972) 444 -8889 Fax: (972) 444 -8893
GROW
Acct ID: 1770 File No: C10 -0631 Date Sampled: 09/17/2010
Report Date: 09/23/2010 Sampled By: Lane, William
Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis
Location: Bridge Deck - Eastbound Order Number: Vendor #9176
Contractor: JRJ Paving
Client: The City of Coppell
REPORT: Flexural Strength Third Point LAB NO: 90426
Test Method: See Below
TEST RESULTS Report No: 90426
Page 1 of 4
Set: 1 of 2 Material: Concrete Number of Specimens: 6
Location: Bridge Deck on Bethel Road - Eastbound Lane, Station 42 +33
Modulus Average
Maximum of Modulus
Age Tested Width Depth Span Moisture Cure Load Rupture of Rupture
Nbr (days) (in) (in) (in) Condition Cap Loc (Ibs) Break Type (PSI) (PSI)
1 4 6.00 6.00 18.00 Wet None Lab 7,440 Middle Third 620
2 tn 6.05 6.00 18.00 Wet None Lab 7,560 Middle Third 625 " 4
3 7 18.00
4 7 18.00
5 28 18.00
6 28 18.00
04. .
e. e -' *''' A f lit
I '
. / i
V-7- .
7f V //Z4
0
Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Respectfully Submitted,
Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E.
(1 -ec copy) Alliance Geotechnical Group
1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E.
1 -ec JRJ Paving Attn: Mr. Marty Murphy
1 -ec The City of Coppell Attn: Rhonda Adloo
.4
1 -hc The City of Coppell Attn: Mr. Larry Davis '' ' rr
Robert P. Nance, Sr. Project Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
_r__. _____ .__, ____ _ Consulting Engineering * Geotechnical Engineering * Construction Materials
4 -ip fLL WINCE 3228 Halifax Street, Suite A, Dallas, Texas 75247
1 GEQTECHIICP1L Phone: (972) 444 -8889 Fax: (972) 444 -8893
GKOUr
Acct ID: 1770 File No: C10 -0631 Date Sampled: 09/17/2010
Report Date: 09/23/2010 Sampled By: Lane, William
Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis
Location: Bridge Deck - Eastbound Order Number: Vendor #9176
Contractor: JRJ Paving
Client: The City of Coppell
REPORT: Flexural Strength Third Point LAB NO: 90426
Test Method: See Below
TEST RESULTS Report No: 90426
Page 2 of 4
Specification:
Curing Method: Standard Transported By: LMC Date Received: 09/18/2010
Time Sampled: 7:30 am Source /Sampled At: Truck / Center
Temp.: Ambient: 77 °F Plant: 3
Mix: 79 °F Truck No: 9106
Slump: 5.50 Inches Mix Code: 1851
Air Content: 5.3% Ticket No: 3282120
Quantity Represented: 5 cu. yds. at 10 cu. yds. placed of a 100 cu. yd. total placement
Remarks:
Test Method (As Applicable): ASTM C31, C42, C192, C78, C143, C172, C1064, C173 or C231; AASHTO T23, T97, T119,
T309, T196 or T152
/ / ( et/
f
k
Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. ctfully Submitted,
Ong: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, . 4. 6 t
(1 -ec copy) fiance Geotechnical Group
1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E.
•
•
1 -ec JRJ Paving Attn: Mr. Marty Murphy
1 -ec The City of Coppell Attn: Rhonda Adloo
1 -hc The City of Coppell Attn: Mr. Larry Davis .0 /' !
Robert P. Nance, Sr. Project Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
__ ._._ .._� __..____.. Consulting Engineering * Geotechnical Engineering * Construction Materials
4, flLLIfl 10E 3228 Halifax Street, Suite A, Dallas, Texas 75247
GEOTECFir1ICl9L Phone: (972) 444 -8889 Fax: (972) 444 -8893
Gilou r
Acct ID: 1770 File No: C10 -0631 Date Sampled: 09/17/2010
Report Date: 09/23/2010 Sampled By: Lane, William
Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis
Location: Bridge Deck - Eastbound Order Number: Vendor #9176
Contractor: JRJ Paving
Client: The City of Coppell
REPORT: Flexural Strength Third Point LAB NO: 90426
Test Method: See Below
TEST RESULTS Report No: 90426
Page 3 of 4
Set: 2 of 2 Material: Concrete Number of Specimens: 6
Location: Bridge Deck on Bethel Road - Eastbound Lane, Station 43 +00
Modulus Average
Maximum of Modulus
Age Tested Width Depth Span Moisture Cure Load Rupture of Rupture
Nbr (days) (in) (in) (in) Condition Cap Loc (Ibs) Break Type (PSI) (PSI)
1 4 6.05 6.00 18.00 Wet None Lab 6,840 Middle Third 565
2 4 6.05 6.10 18.00 Wet None Las 7,200 Middle Third 575 *- 570
3 7 18.00
4 7 18.00
5 28 18.00
6 28 18.00
40 f/
II'
i0\til' e
Charge: The City of Coppell Attn: Mr. Keith Marvin, P E. Respectfully Submitted,
Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E.
(1 -ec copy) Alliance Geotechnical Group
1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E.
1 -ec JRJ Paving Attn: Mr. Marty Murphy
1 -ec The City of Coppell Attn. Rhonda Adloo
1 -hc The City of Coppell Attn: Mr. Larry Davis dr' !J'
{I
Robert P. Nance, Sr. Project Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
Consulting Engineering * Geotechnical Engineering * Construction Materials
40, F LLIR 10E 3228 Halifax Street, Suite A, Dallas, Texas 75247
I EOTECHPIICFIL Phone: (972) 444 -8889 Fax: (972) 444 -8893
GROW
Acct ID: 1770 File No: C10 -0631 Date Sampled: 09/17/2010
Report Date: 09/23/2010 Sampled By: Lane, William
Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis
Location: Bridge Deck - Eastbound Order Number: Vendor #9176
Contractor: JRJ Paving
Client: The City of Coppell
REPORT: Flexural Strength Third Point LAB NO: 90426
Test Method: See Below
TEST RESULTS Report No: 90426
Page 4 of 4
Specification:
Curing Method: Standard Transported By: LMC Date Received: 09/18/2010
Time Sampled: 8:45 am Source /Sampled At: Truck / Center
Temp.: Ambient: 81 °F Plant: 3
Mix: 79 °F Truck No: 7024
Slump: 5.00 Inches Mix Code: 1851
Air Content: 5.2% Ticket No: 3282132
Quantity Represented: 55 cu. yds. at 60 cu. yds. placed of a 100 cu. yd. total placement
Remarks:
Test Method (As Applicable): ASTM C31, C42, C192, C78, C143, C172, C1064, C173 or C231; AASHTO T23, T97, T119,
T309, T196 or T152
Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Respectfully Submitted,
Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E.
(1 -ec copy) Alliance Geotechnical Group
1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E.
•
1 -ec JRJ Paving Attn: Mr. Marty Murphy
1 -ec The City of Coppell Attn: Rhonda Adloo ,,
1 -hc The City of Coppell Attn: Mr. Larry Davis �' .i.
{1 ,
Robert P. Nance, Sr. Project Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
êëöçôåô
êõäíäæãôçøòô
êó
êõäíäæ
øáðìäì
äéåäçô
êøõ
ðõåñôéåñéøë
êðæåäçôäçô
êëõðåðêë
êö
÷çøé
ôåêëô
ø÷
ôåêëô
ø÷
åøëõøçõ
êëöçôåô
êõäíäæãôçøòô
êó
êõäíäæ
øáðìäì
äéåäçô
êøõ
ðõåñôéåñéøë
êðæåäçôäçô
êëõðåðêë
êö
÷çøé
ôåêëô
ø÷
ôåêëô
ø÷
åøëõøçõ