Loading...
Kimbel Addn L8-12R-CS070913 (2)CONSULTING CIVIL ENGINEERS 0 SURVEYORS September 13, 2007 Keith Marvin, P.E. City of Coppell Engineering Dept. 255 Parkway Blvd. Coppell, TX 75019 RE: Kimbel Addition NEC Sandy Lake Rd. & MacArthur Blvd. Impact Fees Mr. Marvin: (972) 304 -3681 (972) 304 -3570 fax After review of the Fee Assessment Letter dated September 10, 2007, we would like to request a reduction of the calculated roadway impact fee based on the following information. The proposed CV S/Pharmacy store size is 12,900 S.F. We are reducing the size of the existing retail to 1,658 S.F. We are also demolishing the existing 2,600 S.F. convenience store on site. This will result in a net add equal to 8,642 S.F. of building space. Based on these figures and your fee calculation page, we believe the total roadway impact fee should be $10,266.70. If you have any questions, please give me a call. Sincerely, c , =knan hael T. Do , P.E. el & ssociates (972) 490 -7090 (972) 490 -7099 fax mdoggett@,winkehnann.com cc: Chas Fisher— AGOC Mike Clark — WAI Alen Hinckley — Yorkshire West G: \office data \work \395 \63 \OA\marvin 09- 13- 07.doc 6750 Hillcrest Plaza Drive, Suite 100 Dallas, Texas 75230 (972) 490 -7090 Fax (972) 490 -7099