Loading...
ST8801-CS 891024 (2) Kimley. Horn Kimley-Horn and Associates, Inc. ENGINEERS * PLANNERS * SURVEYORS 12660 Coit Roa(L Suite 200 Dallas, Texas75251 214 366-7007 Facsimile 214 239-3820 October 24, 1985,.. Ms. Shohre Daneshmand City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Sandy Lake at MacArthur Intersection Design Meeting Dear Shohre: The following outline is a summary of our meeting held on October 23, the first meeting for the Sandy Lake Road and MacArthur ~oulevard intersection design: A) Design Survey I. Kimley-horn has completed 90 percent of the design surve_v required for this project. The remaining survey will consist of vertical information necessary for utility relocation. B) Paving 1. A working drawing showing the existing paving, driveways, and alleys was completed from the design survey. 2. The ultimate section for Sandy Lake Road, a six-lane divided thoroughfare, will be constructed with left turn lanes. The improvements for Sandy Lake Road """win extend approxi~-,~atel3~ -,t,~A~ to 600 feet each side of MacArthur Boulevard. 3. The initial profile for Sandy Lake Road will lower the grade to accommodate MacArthur Boulevard to the south. C) Utilities 1. At this time the extent of utility relocation is unknown. If the grade on Sandy Lake Road is lowered more than two to three feet, utilities such as gas, cable television, and telephone may have to be lowered to maintain a minimum cover. 2. City utilities such as water and sanitary sewer should be low' enough to accommodate the new paving location. 3. All power and telephone poles will have to be relocated to an area of two to three feet inside the street right-of-way. 4. The storm drainage system will all be underground, within the paving section, and discharge into the drainageway along the south side of Sandy Lake Road. Ra!eigh * Sari Diego * Stuart * Tartl, oa * Vero Beach * Virginia Beach · West Palm Beach Ms. Sl~ohre Daneshmand - 2 - October 24, 1989 D) Right-of-way 1. The existing right-of-way on MacArthur Boulevard south of Sandy Lake is 115 feet, with a transition to 100 feet as you go south. MacArthur Boulevard north of Sandy Lake is 110 feet, with a _,4~;-" transition to 100 feet prior to Village Parkway. 2. Sandy Lake Road is a minimum of a 100-foot right-of-way within the proposed improvement area. The dedication from Lakeside Village makes it a 105-foot right-of-way from MacArthur Boulevard west to the end of the Lakeside Village tract. E) Schedule /r , 1. Kimley-Horn will provide a preliminarl/plan and profile for Sandy Lake Road prior to the October Mst DRC meeting. 2. Final design is expected to be complete by November 21. If you have any questions or need further information, please feel free to call. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. F. Eugene Middleton pw 10-89/Coppet t . FEll