Loading...
ST8801-CS 890922 FILE September, 22, 1989 TO: Ben Dela Cru~, Engineering Technician Howard Pafford, Water Foreman Per Birdsall, Street Foremen VIA: Russell Doyle, City Engine~J FROM: Shohre Daneshmand, Civil Engineer~ RE: Left Turn Lane Design Plans for Sandy Lake/MacArthur Blvd. Intersection As you may know, on August 22, 1989, City Council approved the above project to be designed by Kimley-Horn and Associates. Mr. Eugene Middleton with Kimley-Horn, is the project engineer and he has requested the following information and plans related to above intersection: 1) Existing water and sewer (utility) plans 2) Construction plans on the ezisting channel which runs along south R.O.W. line of Sandy Lake, East and West of MacArthur Blvd. 3) 'Cross town water line' plans which covers the above referenced intersection 4) Coppell standard details (has been provided) 5) Topo maps 6) MacArthur Blvd. construction plans (North and South of Sandy Lake Road) 7) Woodridge subdivision on the south west corner of the intersection 8) Construction plans for the shopping center on the southeast corner of said intersection 9) Any other plans that you are aware of within 300 feet of the intersection along Sandy Lake Please note that time is of essence on this project and the project engineer has already started this project with the survey of the intersection. I respectfully request that you provide the above mentioned plans thru myself to Mr. Middleton by Wednesday, Sept. 27, 1989. If you don't have the mentioned construction plan, please give me the name of the engineering firms who had prepared said plans, so we can obtain the plan from them. Upon your notification, I will stop by your offices to receive the above,listed information. I appreciate your assistance and should you have any questions, please do not hesitate to call me. Thanks. xc: Alan Ratliff, City Manager Steve Goram, Director of Public Works