Loading...
ST8801-CS 890810August 10, 1989 ;:~',i::'- -- l Ms. Shohre Daneshmand i~],Cz_ ......... Civil Engineer City of Coppell k ......................... P.O. Box 478 Coppell, Texas 75019 RE: Proposal for Intersection Improvement Plans for Sandy Lake Road at MacArthur Boulevard; J89226.9 Dear Ms. Daneshmand: We are pleased to submit this proposal to provide engineering services for the development of intersection improvements for the intersection of Sandy Lake Road at MacArthur Boulevard. If accepted by you, this proposal will become a Letter of Agreement between the City of Coppell and DeShazo, Starek & Tang, Inc. (DS&T) to provide the scope of services described below. SCOPE OF SERVICES Our scope of services includes the work described in the following tasks: TASK I - CONFIRM THE SCOPE OF SERVICES WITH THE CITY STAFF TASK 2 - DATA COLLECTION AND ANALYSIS 2.1 Make appropriate traffic counts. 2.2 Perform a signal warrant analysis. TASK 3 - INTERSECTION GEOMETRY 3.1 Using existing count data, determine an interim geometric design for the intersection. 3.2 Formulate a detailed schematic design for the ultimate sec- tion of Sandy Lake Road (six lane divided) and MacArthur Boulevard (four lane divided) including planned geometric layout and preliminary profiles. 330 l'nion Station /..;0_-481)_ Dallas. Texas ':,'~ ') 214 748-6740 Ms. Shohre Daneshmand :' August 10, 1989 : Page Two ~ ~lb~ ~ O~ TASK 4 - TRAFFIC SIGNAL DESIGN ~ ................. 4.1 Using the information in Tasks 2 and 3, prepare plans and specifications for a traffic signal at Sandy Lake Road and MacArthur Boulevard. DELIVERABLES The conclusions and recommendations of this effort will be presented in the form of schematic intersection design drawings and traffic signal plans and specifications. PROJECT STAFF Mike Starek will serve as Principal-in-Charge and Tom Simerly as Project Manager. Mike Starek and/or Tom Simerly will attend project meetings and presentations as needed. Appropriate staff design per- sonnel will assist. FEE FOR SERVICES AND METHOD OF PAYMENT The fee for completing the project will be based on our hourly rates on a time and expense basis. The fee will not exceed $20,000.00 without written authorization. Services rendered will be billed at the following rates: Principals $125/hour Professional, Technical Salary Cost and Clerical x 2.5 Expenses Net x 1.15 Invoices will be submitted monthly and will indicate charges incurred during the preceding month. Billings are due and payable within thirty (30) days of invoice date. A one and one-half (1.5) percent carrying charge will be added each month to all past due accounts. LIMITATIONS ON LIABILITY Limitations on liability help to keep our fee structure as low as possible. The client agrees to limit the liability of DeShazo, Starek & Tang, Inc. to the client and to any and all contractors and sub- contractors on the project due to negligent acts, errors or omissions by DeShazo, Starek & Tang, Inc. such that the total aggregate liabi- lity of the firm to all those named shall not exceed $50,000, or the total fee for services rendered on this project, whichever is greater. Ms. Shohre Daneshmand August 10, 1989 Page Th ree AUTHORIZATION We are prepared to initiate work on this project upon receipt of a signed copy of this Letter of Agreement. This proposal will remain valid for thirty {30} days. We appreciate the opportunity to submit this proposal and look forward to assisting you on this project. If you have any question regarding this proposal, please give me a call. Si nce rely, DeSHAZO, STAREK & TANG, INC. d. Michael Starek, P.E. Vice President TJS/tde THIS AGREEMENT ACKNOWLEDGED AND ACCEPTED: BY: DATE: TITLE: