Loading...
ST8801-CS 890803August 3, 1989 '? ~ ~s. Shohre Daneshmand Civil Engineer City of Coppell P.O. 478 Copoell, Texas 75019 RE: Proposal for Intersection Plans for Sandy Lake Road and MacArthur Boulevard Dear Ms. Daneshmand: Per our conversation today regarding the use of $20,000 in DART Local Assistance Program funds for the above intersection, the following scope of work is proposed: 1. Preparation of plans and specifications for the ultimate signal design for the intersection. 2. Formulation of a detailed schematic design for the ultimate sec- tion of Sandy Lake Road (proposed six-lane divided) and MacArthur Boulevard (existing four-lane divided) including planned geometric layout and preliminary profiles. 3. Schematic drainage plans for the ultimate intersection design. 4. Utilization of above ultimate planned schematics to develop a potential interim design for Sandy Lake Road which would involve the construction of sheltered left-turn lanes and/or free right turn lanes. This proposal represents our best effort to identify a scope of ser- vices which matches the $20,000 available. In order to provide an immediate response to your request, we have not taken the time to cost out each of these items identified above, however, our experience suggests that these costs are in line. 330 i.'nion Station Dallas. 'l't. xas 75202-4802 214-748-6740 Ms. Shohre Daneshmand August 3, 1989 Page Two If you would like further information on this preliminary proposal, please contact Mr. Tom Simerly or myself. Thank you for the oppor- tunity to submit this proposal to the City of Coppell. Very truly yours, DeS _~,~ STARE~&. TANG, INC. . ~i~d. Michael Starek, P.E. Vice President JMS/tde 89JD