Loading...
TR0801-CS101006 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, P.E., Dir. of Engineering / Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Per Birdsall, Streets Operations Manager Keith Marvin, P.E., Project Engineer From: Albert Samaniego, Construction Inspector Office Phone: (972) 304-3685 Fax: (972) 304-3570 Date: October 6, 2010 RE: WALK-THRU INSPECTION for TR 08-01 Traffic Signal: E. Sandy Lake Rd @ Riverchase Dr. A final walk-thru for the referenced project has been scheduled for: Tuesday, October 12, 2010 at 2:00 p.m. Please let me know if I can be of further assistance. cc: Roadway Solutions fax # 972-245-2299 "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"