Loading...
Thompson, Johnny-CS 940606 MEMORANDUM To: Jim Witt, City Manager From: Kenneth M. Griffin, P.E., Assistant City Manager /City Engineer RE: Thompson Homestead Date: June 6, 1994 I have reviewed the June 3, 1994 letter concerning the settlement agreement for the Thompson Homestead and the various facilities located on that homestead property. In reading the settlement agreement and viewing the aerial mapping, it is my understanding that everything except for building #2 is an existing building and as such will be annexed into the City as an existing facility. It is my understanding that there is some minor reconstruction taking place on several of the facilities, but again they are all existing except for building #2. In reviewing the location for building #2, to the best my ability it appears as though building #2 is not located within a designated floodplain area of the City of Coppell. Therefore, the construction of that facility should not be a problem. I have also reviewed the minimum elevation as set forth in the letter agreement of 446.6 and find that this is above the floodplain elevation of this area. Generally, the floodplain elevation of this area ranges from 441 to 442.5, so an elevation of 446.6 exceeds our minimum two foot elevation above the floodplain. In summary, because the location of building #2 in not in a designated floodplain, because the other facilities are currently existing on the ground, and because the elevation exceeds our minimum requirement, I have no objections to the letter agreement as written. file/kgriffin/thmpson.hms