Loading...
SW0801-CS101012 3D Paving and Contracting, LLC P.O. BOX 1698, COPPELL, TX. 75019 OFFICE`: 972 - 393 -1876 FAX: 972 - 393 -1866 Oct. 11,2010 CONSTRUCTION SCHEDULE FOR DENTON TAP SIDEWALK INFILL -( 150 CAL DAYS. 2010 Nov. 1- Nov. 5 Mobilization, Barricades going north, excavate, set forms Nov. 8- Nov.12 set forms and pour concrete: Nov.15- Nov.19 set forms and pour concrete: retaining walls Nov.22- Nov.26 set forms and pour concrete: Nov.29 -Dec.3 set forms and pour concrete: Dec.6- Dec.10 set forms and pour concrete: Dec.13- Dec.17 set forms and pour concrete: Dec.20- Dec.23 Concrete flume /modified curb inlet: Dec.27- Dec.31 Relocate water meters: 2011 Jan.3 -Jan.7 Mobilization, Barricades going south, excavate, set forms Jan.10- Jan,14 set forms and pour concrete: retaining walls Jan.17- Jan.21 set forms and pour concrete: Jan.24- Jan.28 set forms and pour concrete: Jan.31-Feb.4 set forms and pour concrete: Feb.7- Feb.11 set forms and pour concrete: Feb.14- Eeb.18 set forms and pour concrete: Feb.21- Feb.25 Install railing/ railroad signs: Feb.28 -Mar.4 Remove and replace metal guardrail: Mar.7- Mar.11 Block sod: Mar_14- Mar.18 Pickup, cleanup, closeout Mar.21- Mar.25 Mar.28- Mar.31 Roger DupreN M aging Partne� 3D PAVING AND CONTRACTING, LLC P. 0. BOX 1698 COPPELL, TX. 75019 Phone : 972-393-1876 Fax : 972 - 393 -1866 Email : roger_ 3dcontracting @verizon.net Fax Transmittal Form To: George Marshall From: Roger Dupre Name: Date Sent Oct.1l, 2010 CC: Phone: Number of Pages: 2 Fax: 972- 3043570