2004_05_25 T H E C 1 T Y O F COPPELL A- 9 A S 1 CIP Utility Meeting May 25, 2004 — 2:00 p.m. I. City Contacts Keith Marvin, P.E. Civil Engineer (972- 304 -7044) — in -house designs, permit review & approval Suzan Taylor — CIP Coordinator (972- 304 -7019) — plans, construction schedules, utility meetings Garreth Campbell — Construction Inspector (972- 304 -3685) Larry Davis — Construction Inspector (972- 304 -3684) Rick O'Dell — Construction Inspector (972- 304 -7090) Engineering Fax No. — 972 - 304 -3570 Streets Telephone No. — 972 - 462 -5150 Water Utilities Telephone No. — 972 - 462 -5155 II. Status of Proposed City Construction Projects STREETS Project: ST 93 -01 Name: Sandy Lake Road (Kimbel Kourt to East City Limits) Design Engineer: Jacobs Civil Scope: ± 4300 L.F. — Reconstruct 2 -lane asphalt to 4 -lane divided roadway with drainage improvements Status: Design is 99% complete. Updated plans available during this meeting. Right -of -Way: Right -of -way acquisition is complete. Utilities: February 4, 2004 follow -up letter regarding any new facilities constructed since 2002 sent. Utilities need to initiate relocations. Eight horizontal/vertical control monuments have been set. UTILITY COMPANY FACILITIES WITHIN RELOCATION EST. PROJECT LIMITS COMPLETION DATE AboveNet No facilities (09- 16 -02) AT &T Local Network Services No facilities (09- 18 -02) Brazos Electric Company No facilities (02- 11 -04) Comcast CoSery No facilities (09- 30 -02) Explorer Pipeline McLeod No facilities Oncor Electric OnFiber Carrier Services Qwest Communications No facilities (10- 03 -02) SBC No facilities (09- 23 -02) 1 UTILITY COMPANY FACILITIES WITHIN RELOCATION EST. PROJECT LIMITS COMPLETION DATE TXU Communications Services TXU Gas Verizon Communications Dallas Water Utilities No conflicts City of Irving No conflicts 360networks Inc. No facilities (09- 19 -02) Estimated Construction Start: July /August 2004 Project: ST 99 -05 Name: Bethel Road I (West City Limits to Freeport Parkway) Design Engineer: Tran Systems Scope: ± 6500 L.F. — Reconstruct 2 -lane asphalt to 4 -lane divided roadway with drainage and channel improvements. May construct the roadway and channel as separate projects due to the USACE 404 permitting process. Status: Design is 90% complete. 80% plans have been provided to utility companies. Right -of -Way: Right -of -way acquisition for the roadway is underway. Drainage easement acquisition for the channel has not started. Some utilities may conflict with the proposed channel. Will need right -of -way at the box culvert — part of Bethel II acquisition. Parcel 1 Fellowship of Las Colinas ACQUIRED Parcel 3 Walter Hogg Partnership Appraisal process started on 04 -27 -04 Parcel 4 DFW Airport June 8, 2004 City Council Parcel 5 Gulf United Industries ACQUIRED Parcel 6 Texas Dugan Limited Partnership Corner Clip Parcel 7 Hillwood Investment Properties ACQUIRED Parcel 8 Minyards Food Store ACQUIRED Parcel 9 Texas Dugan Limited Partnership Corner Clip Parcel 10 City of Coppell ACQUIRED Parcel 11 Texas Dugan Limited Partnership Corner Clip Utilities: Utilities can initiate relocations on the north side of the roadway (from east of Royal Lane to east of Freeport Parkway). Utilities may locate facilities under the proposed roadway on parcels that have not been acquired (from east of Royal Lane to east of Freeport Parkway) or wait until the right -of -way has been acquired to relocate facilities. Oncor — coordinate with the Town of Grapevine on construction of Bethel/Bass Pro Roads. UTILITY COMPANY FACILITIES WITHIN RELOCATION EST. PROJECT LIMITS COMPLETION DATE AboveNet 05 -12 -03 permit approved Utilities relocated AT &T Local Network Services 05 -12 -03 permit approved Utilities relocated 2 UTILITY COMPANY FACILITIES WITHIN RELOCATION EST. PROJECT LIMITS COMPLETION DATE Comcast CoSery Explorer Pipeline Consultant working with Explorer to minimize length of relocation McLeod Oncor Electric OnFiber Carrier Services Qwest Communications 05 -24 -02 - submitted plans: coordinate relocation with 360networks Inc. SBC 05 -12 -03 permit approved Utilities relocated 360networks Inc. 12 -02 -02 - submitted plans: (Touch America) coordinate with Qwest TXU Communications Services TXU Gas Verizon Communications 06 -05 -03 - submitted plans: will wait until right -of -way is acquired to relocate Estimated Construction Start: 4 Quarter 2004 Project: ST 99 -02A Name: Sandy Lake Road (SH 121 to Coppell Road N.) Royal Lane (Northpoint to Sandy Lake) Design Engineer: Teague Nall and Perkins Scope: ± 6500 L.F. — Reconstruct 2 -lane asphalt to 4 -lane divided roadway with drainage and channel improvements. - ±1300 L.F. - Construct two additional lanes to make Royal Lane a 4- lane divided roadway Status: Design is 80% complete. Initial contact was made with utilities in June to August 2001 to determine location of facilities. 80% plans were sent to utility companies on October 31, 2003. Right -of -Way: Preparation of right -of -way and easement documents should be complete by June 2004. Utilities: Relocations not initiated. Estimated Construction Start: 4 Quarter 2004 Project: MA 02 -03 Name: Brick Paver Replacement Program Design Engineer: In -House Scope: Remove and replace brick pavers with alternate material along MacArthur Boulevard, (DeForest to Belt Line Road). Seven possible intersections. 3 Status: Design is 85% complete. The City is reviewing options for the replacement material Plans were sent to utilities on April 20, 2004. Right -of -Way: In City of Coppell right -of -way. Utilities: UTILITY COMPANY FACILITIES WITHIN RELOCATION EST. PROJECT LIMITS COMPLETION DATE AboveNet No facilities (05- 05 -04) AT &T Local Network Services No facilities (04- 27 -04) Comcast Explorer Pipeline McLeod No facilities (04- 26 -04) Oncor Electric OnFiber Carrier Services SBC Communications TXU Communications Services TXU Gas Verizon Communications No facilities (04- 27 -04) Estimated Construction Start: 3 Quarter 2004 WATER Project: WA 00 -02 Name: Golden Triangle Mobile Home Park Design Engineer: Pacheco Koch Consulting Engineers Scope: ± 900 linear feet of 8" water line and 3 fire hydrants. The water line is within utility easements in the mobile home park and Alford Media property. Status: June 8, 2004 City Council & June 15, 2004 County Commissioner's Court. Plans were provided to utility companies during Dallas County's monthly utility meeting in May 2003. Right -of -Way: Land rights acquisition is complete. Utilities: Gas easements throughout the mobile home park. Estimated Construction Start: June /July 2004 Project: WA 01 -01 Name: SH 121 Water Line Design Engineer: Birkhoff, Conway & Hendricks Scope: ± 8800 linear feet of 12" water line and appurtenances. The majority of the water line is within SH 121 right -of -way and a small portion is within utility easements and City right -of -way. Status: Design is 90% complete. Plans available during this meeting. Right -of -Way: Three to four parcels — land rights acquisition has been initiated. Utilities: Design engineer is making contact with the utilities located inside of the SH 121 utility corridor to try and determine any conflicts with the proposed water line. Estimated Construction Start: 4 Quarter 2004 4 SEWER Project: SS 99 -01 Name: DeForest and Sandy Lake Force Main — Line "D" Scope: ± 8700 linear feet of 30" force main by directional drilling. Part of the force main is within MacArthur right -of -way and part of the force main is within existing and proposed utility easements Status: Construction Contract awarded during the May 11, 2004 City Council meeting. Plans provided during the November 13, 2003 utility meeting. Utilities: Estimated Construction Start: June 2004 Project: SS 02 -01 Name: Service Center Sanitary Sewer Line Design Engineer: In -House Scope: ± 1800 linear feet of 18" sewer line along the DART railroad line from Coppell Road to Grapevine Creek. Status: Construction Contract awarded during the May 11, 2004 City Council meeting. Plans provided to utilities in February 2004, follow -ups in March and April. Right -of -Way: Utilities: UTILITY COMPANY FACILITIES WITHIN RELOCATION EST. PROJECT LIMITS COMPLETION DATE AboveNet no conflicts (02- 24 -04) AT &T Local Network Services no conflicts (02- 17 -04) Brazos Electric Company no facilities (02- 11 -04) Comcast no conflicts (03- 30 -04) CoSery no conflicts (02- 13 -04) Explorer Pipeline verbal contact McLeod no conflicts (02- 18 -04) Oncor Electric no conflicts (04- 23 -04) OnFiber Carrier Services Qwest Communications utilities in area (03- 04 -04) SBC no conflicts (03- 02 -04) TXU Communications Services 360 Networks Inc. No conflicts (04- 01 -04) TXU Gas Estimated Construction Start: June 2004 TRAFFIC Project: TR 03 -01 Name: MacArthur / Belt Line Traffic Signal Design Engineer: In -House Scope: Replace cabinet and foundations, loops, rewire, install red LEDs and replace mast arms to accommodate left turn signals. Status: Design is 75% complete. Plans available during this meeting. 5 Right -of -Way: NA Estimated Construction Start: 3r Quarter 2004 III. Permits Utility companies need to complete and submit a Right -of -Way permit for utility relocations that are required on municipal projects. IV. Update Utility Company Contacts The contact list is attached. Please correct as necessary and return to me. 6