ST8801-CS 880216 ---- FILE COPY
City of Coppell
Five-Year
Program
SUBMITTED BY
~IL~N D, R~TLIFF
CITY HANAGER
FEBRUC)4R¥ 16, 1988
TABLE OF CONTENTS
PAGE
!. Capital Improvement Program Message - City Manager ..................... i-ii
II. Capital Pro;ects Currently Funded
A. Streets/Traffic Signal Improvements and
Water/Sewer Improvements
1. Streets and Traffic Signal Projects
a. Summary of Projects and Cost Estimates ...................... 2
b. Project Descriptions
I. Denton Tap Road - Construction ......................... 3
2. Denton Tap Road - Lighting and Landscaping ............. 4
3. Be!tline Road (N-S) Lighting and Landscaping ........... 5
4. Deforest Road/Warren Court Cul-de-sac Paving ........... 6
5. Beltline (E-W) Segments A-C - Design ................ 7-9
6. Parkway Boulevard - Paving ............................ 10
7. Samuel ~oulevard - Paving ............................. 11
8. Beltline Road/Cowboy Drive - Traffic S~gnal ........... 12
9. Beltline Road/Denton Tap Road - Traffic Signal ........ 13
10. Denton Tap Road/Bethel School Rd. - Traffic Signal .... 14
Il. Denton Tap Rd./Parkway Blvd. - Traffic Signal ......... 15
i2. Sandv Lake Rd./MacArthur - Temporary Signal ........... 16
13. Sandy Lake Rd./Moore Road - Temporary Signal .......... 17
IA. Preeport Parkway Storm Sewer .......................... 18
15. City-Wide Mapping ..................................... 19
2. Water and Sewer Projects
a. Summary of Projects and Cost Estimates ..................... 20
b. Project Descriptions
!. 24" RCCP Waterline .................................... 21
2. i0 MGD Pump Station ................................... 22
3. 5 MGD Ground Storage Tank ............................. 23
III. Proposed Eive (5) Year Capital Improvement Program Projects
A. Infrastructure Improvements
1. Drainage Improvement Projects
a. Summary of Proposed Projects and Cost Estimates ............ 24
b. Project Descriptions
1. Fieldcrest Loop ....................................... 25
2. Parkwood Channel ...................................... 26
3. Sandy Knoll and Woodhurst Drive ....................... 27
~. ~hisperin~ H~!ls ...................................... 28
2. Street Asphalt Overlay, Sealcoat and Repair Improvements Projects
a. Summary of Proposed Projects and Cost Estimates ............ 30
b. Project Descriptions
'. Bethel Road ........................................... 31
2. Bethel School Road (West) ............................. 32
3. Carter Estates Interior Streets ....................... 33
4. Coppell Road ....................................... 34-36
5. Cottonwood Drive ...................................... 37
6. Cowboy Drive .......................................... 3~
~,. Hollv Street and Nash Drive .......................... . 39
8. Northlake Woodlands Phases I-VIII Interior Streets.40-41
9. Park Street, Lock Lane, Bullock Street and
Howell Street ....................................... 42
10. Pelican Lane .......................................... 43
11. Plantation Drive ...................................... 44
i2. Oak Trail and Shady Dale Lane ......................... 45
13. Ruby Road, State Road and Oak Grove Road .............. ~6
14. Sanders Loop .......................................... 47
15. Shadowcrest and Sandv Knoll Intersection .............. 48
16. Southwestern Boulevard ................................ 49
17. Thweatt Road .......................................... 50
18. ~ispering Hills ...................................... 51
3. Street Paving Improvement (Concrete Pavement) Projects
a. Summary of Proposed Projects and Cost Estimates ............ 52
Project Descriptions
b.
1. Bethel Road ........................................... 53
2. Bethel School Road (West) ............................. 54
3. Beltline Road East/West Segments A-C ............... 55-57
' Coppell Road .......................................... 58
5. Lodge Road ............................................ 59
6. Kimbel Kourt .......................................... 60
7. Sandy Lake Road/MacArthur Intersection ................ 61
8. Sandy Lake Road .................................... 62-65
9. Thweatt Road .......................................... 66
Municipal Facilities and Equipment Improvement Projects
a. Summary of Proposed Projects and Cost Estimates ............ 67
b. Project Descriptions - Fire Department
I. #3 Fire Station - Land Acquisition .................... 68
2. Central Fire Station - Construction ................... 69
3. ~3 Fire Station - Construction ........................ 70
4. ~4 Fire Station - Land Acquisition .................... 71
5. 100' Aerial Fire Truck ................................ 72
6. Tr~-Cities Fire Training Center ....................... 73
7. Radio System Upgrade .................................. 74
~. Fire Hydrant System Upgrade ........................... 75
PROJECT DESCRIPTION:
Timetable to
I:~,JECT dUSTIFICATION:
i. Right-of-Way L Notes-
l_a~scapincj
41 Design: Inspectkm, .,
6 Other
Est. Project Total' ~> ~.ll~"JO0 ~epo,,d B~-
PROJECT' '"'
(Map or Diagrom) ..
-
~JECT DESCR~~:
mOJECT J~~IFICA~:
Notes
I. Lond Ac~/ROW,
3. Londscoping
4. Design,~~ ;
'
Est. Project ToloI'