Loading...
ST8805-CS 910820August ZO, 1991 Mrs. )4. Shohre Daneshmand, P.E. Engineering Department City of Coppell Re: Proposed Alignment, Parkway Boulevard Dear Mrs. Daneshmand: Graham Associates is the civil engineer representing E-Systems, Inc. I am requesting the approval of the geometric alignment of Parkway Boulevard and entrance ramp to S.H. 121 as shown on the attached drawings. Upon your approval, please forward to the State Highway Department for their review and approval. As per our meeting, I have enclosed the following: Proposed geometric alignment of Parkway Boulevard. Location map of proposed entrance ramp and surrounding thoroughfares. Vicinity map locating connection points Parkway at S.H. 121. for Royal and Freeport 4. Approved alignment of Parkway Boulevard north of S.H. 121 by Grapevine. ' 5. Letter of consent by adjacent property owner. I have visited with Mr. Roy Wilshire of Kimley Horn and Mr. K.R. Marshall of Barton Ashman. In both conversations, they stated that the geometrics have not been establ(shed for Parkway Boulevard and the exact location of the thoroughfares along S.H. 121 has not been determined. I have also met with Mr. Bob Price with the City of Grapevine, and the proposed alignment of Parkway Boulevard matches their approved location of Parkway Boulevard at S.H. 121. Therefore, they have no objection to our proposed alignment. Please call me if you have any questions. Thank you f~r your cooperation. Sincerely, GRAHAN ASSOCIATES, INC. W. Jeff Williams, P.E. Vice President