ST0301A-CN100810CITY OF COPPELL
CHANGE OR EXTRA WORK ORDER
PROJECT: Bethel Road H (ST 03 -01A)
CONTRACTOR: JRJ Paving, L.P.
OWNER: City of Coppell
CHANGE ORDER NO.: Two (2) DATE: August 10, 2010
1. Replace old sanitary sewer siphon with new aerial crossing.
2. Miscellaneous utility adjustments.
Page 1 of 2
Item
Description
Quantity
Unit
Unit Price
Total
ADD: 1.
Demo old aerial
1
LS
$5,491.25
$5,491.25
crossing with piers
2.
30" Drilled shaft
20
LF
$204.00
$4,080.00
3.
30" Formed
20
LF
$306.00
$6,120.00
column
4.
Aerial crossing pier
2
EA
$1,437.50
$2,875.00
cap
5.
Stainless straps
4
EA
$402.50
$1610.00
6.
Concrete anchors
2
EA
$1,173.00
$2,436.00
7.
Concrete pipe
20
LF
$72.45
$1,449.00
encasement
8.
Transition
2
EA
$$448.50
$897.00
couplings
9.
Connect to existing
2
EA
$1,207.50
$2,415.00
10.
12" SDR -35 in
140
LF
$134.55
$18.837.00
casing with spacers
11.
20" coated steel
120
LF
$223.10
$26,772.00
casing
12.
Remove existing
1
LS
$7.820.00
$7,820.00
siphon box
14.
Sewer by -pass •
1 LS
$483.00
pumping
$500.00
15.
De- watering
1 LS
15.
Testing
1 LS
16.
24" Concrete plug
1 EA
17.
Install new blow -off
1 EA
assembly
18.
Bracing utility pole
1 LS
Total Additions:
$7,245.00 $7,245.00
$2,645.00
$2,645.00
$483.00
$483.00
$500.00
$500.00
$4,560.00
$4,560.00
$676.08
$676.08
$98,431.33
Previous contract amount
Net increase in contract amount Change Order # 1
Net increase in contract amount Change Order # 1
Revised contract amount
Net increase in contract time of completion
� Revised Contract time of completion
$1,969,019.05
$23,505.50
$98,431.33
S 2,090,955.88
0
270 Calendar Days
The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full
accord and satisfaction of all past and future liability originating under any clause in the Contract by
reason of this revision to the Contract.
{,,, 19-11.10
Rec Engineer Date
O f L11 &o
Agreed to by Contractor Date
Accepted City V 'Date