ST0301A-CN100810CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Bethel Road H (ST 03 -01A) CONTRACTOR: JRJ Paving, L.P. OWNER: City of Coppell CHANGE ORDER NO.: Two (2) DATE: August 10, 2010 1. Replace old sanitary sewer siphon with new aerial crossing. 2. Miscellaneous utility adjustments. Page 1 of 2 Item Description Quantity Unit Unit Price Total ADD: 1. Demo old aerial 1 LS $5,491.25 $5,491.25 crossing with piers 2. 30" Drilled shaft 20 LF $204.00 $4,080.00 3. 30" Formed 20 LF $306.00 $6,120.00 column 4. Aerial crossing pier 2 EA $1,437.50 $2,875.00 cap 5. Stainless straps 4 EA $402.50 $1610.00 6. Concrete anchors 2 EA $1,173.00 $2,436.00 7. Concrete pipe 20 LF $72.45 $1,449.00 encasement 8. Transition 2 EA $$448.50 $897.00 couplings 9. Connect to existing 2 EA $1,207.50 $2,415.00 10. 12" SDR -35 in 140 LF $134.55 $18.837.00 casing with spacers 11. 20" coated steel 120 LF $223.10 $26,772.00 casing 12. Remove existing 1 LS $7.820.00 $7,820.00 siphon box 14. Sewer by -pass • 1 LS $483.00 pumping $500.00 15. De- watering 1 LS 15. Testing 1 LS 16. 24" Concrete plug 1 EA 17. Install new blow -off 1 EA assembly 18. Bracing utility pole 1 LS Total Additions: $7,245.00 $7,245.00 $2,645.00 $2,645.00 $483.00 $483.00 $500.00 $500.00 $4,560.00 $4,560.00 $676.08 $676.08 $98,431.33 Previous contract amount Net increase in contract amount Change Order # 1 Net increase in contract amount Change Order # 1 Revised contract amount Net increase in contract time of completion � Revised Contract time of completion $1,969,019.05 $23,505.50 $98,431.33 S 2,090,955.88 0 270 Calendar Days The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. {,,, 19-11.10 Rec Engineer Date O f L11 &o Agreed to by Contractor Date Accepted City V 'Date