WA9903-CS000406SHIMEK, JACOBS & FINKI,EA, L.L.P.
CONSULTING ENGINEERS
8333 DouglasAvenue,#820
RONALD V. CONWAY, P.E.
JOHN W. BIRKHOFF, P.E.
JOE R~ CARTER, P.E.
GARY C. HENDRICKS, P.E.
PAUL A. CARLINE, P.E.
MATT H~CKEY, P.E.
ROSS L. JACOBS, P.E.
I. C. FINKLEA, P.E.
Dallas, Texas 75225-5816
Fax (214) 361-0204
April 6, 2000
Phone (214) 361-7900
Architec al Utilities, Inc., dba AUI General Contractors
300 W amsey
Re: City of Coppell
Addition of Pump Number 4 to the Village Parkway Pump Station
Dear Mr. Dake:
We are in receipt of your fax cover sheet dated February 28, 2000 in which you make recommendation for
corrections to the suction piping mis-alignment for pump number 4 and your letter dated March 10, 2000
requesting compensation for the described work. From our field observations, the suction piping appears to
be out for alignment by as much as 1-inch in the vertical direction. You have indicated you believe this is
primarily due to the existing suction header flange being "out of level". We understand your approach to
correct this condition is to re-adjust the upper flange on the new 90-degree bend in order to bring the suction
piping together at the coupling.
Based on our observations, we believe that in addition to the existing flange possibly being out of level, that
the new 90-degree bend is either too tall, not square, or both. Therefore, on behalf of the City of Coppell, you
are hereby directed to remove the 90-degree bend and make the necessary corrections and adjustment to the
lower flange of the bend. This will require careful coordination with the City of Coppell for the shut down of
the pump station and will most likely require the re-installation of the 30-inch blind flange while the
adjustments are being made. As we have indicated previously, the City will not be able to shut the pump
station down for extended periods of time nor during times of peak demand use.
In response to your request for compensation in the amount of $840 for the above described work, it is the
contractors responsibility to field measure and verify all pipe fitting work prior to fabrication and installation
of the project piping. This includes verifying the condition, orientation and location of the existing pipes and
fittings. Therefore no additional compensation will be provided for the work necessary to correct the piping
alignment.
j :\clc~cal\coppcll\ 1999 - 153 \1 cttcrs\constXk~a] igmcnt corrccti on, doc
Architectural Utilities, Inc., dba AUI General Contractors
City of Coppell - Village Parkway Pump Station
April 6, 2000
Page Number 2
Finally, as we requested, you have provided your proposal for the installation of a ~ -inch tap on the existing
36-inch discharge pipe in the meter vault. We are enclosing five copies of Change Order Number 2 to your
contract with the City of Coppell to cover this additional work. If the change order is acceptable, please sign
and return all five copies back to this office for further execution by the City. We are available to discuss this
project further at your convenience.
cc: Mr. Glenn Hollowell, P.E.
,/1~. Larry Davis
CITY OF COPPELL, TEXAS
ADDITION OF PUMP NO. 4
ATTttF~
VILLAGE PARKWAY PUMP STATION
Project No. WA99-03; Bid No. Q-119902
CHANGE ORDER NO. 2
A. INTENT OF CHANGE ORDER
The intent of this change order is to modify the provisions of the contract entered into between the City of
Coppell, Texas and Architectural Utilities, Inc., P.O. Box 11586, Fort Worth, Texas 76110, for the
Addition of Pump No. 4 at the Village Parkway Pump Station, dated December 14, 1999.
B. DESCRIPTION OF CHANGE
This change covers the installation of W' tap in 36" pipe for pressu.re transmitter.
C. EFFECT OF CHANGE ON CONTRACT AMOUNT
This change order will have the following effect on the cost of this project:
No. Description Quantity This C.O. Quantity Unit Price of Change
5 Install W' tap in 36" pipe for 0 1 1 L.S. $227.00 $227.00
pressure transmitter
I [ Total:
$227.00
Original Contract Amount
Amount, Change 'Order No. 1
Amount, Change Order No. 2
Revised Contract Amount
$346,000.00
10,684.00
227.00
$356,911.00
EFFECT OF CHANGE ON CONTRACT TIME
The contract time shall not be affected by this change order.
AGREEMENT
By the signatures below of duly authorized agents, the City of Coppell and Architectural Utilities, Inc., do
hereby agree to append this Change Order No. 2 to the original contract between themselves dated
December 14, 1999.
By:
Date:
Attest:
City of Coppert, Texas
Owner
j:~lefiea]~opp~X1999-153'~qx~.hange-o~o-2.d~
! I'
(04/06/00)
By:
Date:
Attest:
Architectural Utilities, Inc.
Contractor
Page I of 1
Fel~
29 O] 03:25p RUI General
Contractors
81'/9261911
p.1
PO Box 11586
Feet WoH4t TX 76110
817/926-4377
817/9264387 Fax
auietm~,com
FAX COVER SHEET
I~u · I:mlim. Th~ Fallowice Streets T~:
N~uwl
Gary I-Iendricks
Shjmek, lacobs, & [;inklea, L.L.P.
214-361-0204
This Iax :b Belie Sent
No~ ~ Steve Duke
Gary, I rOc.~mmaK! tim: wo mako afield clmnB~in the anBle oirtho vcrtical ~an8~ on
the3(Y' bend shownlnthedmwln& tocompens~eforthofianSct]ml:is out oflcvel
on din healer. We could do this without removing the bend during one of'the stsfion
shut downs this week Please ~ me your thouShts on this,
Feb 29 O) 03:25p RUI General Contractors 8179261911
'------L~ .... T .... ~ PUMP STATION F
OF
Existing 36' Vo, ut't PipIn9 ~ ~"
, IJ,~,II
, =l. I,, e
xdQ.r ..,.r T... <~v. S> METER VAULT'P II
SHOP N O1 ES:
1. Pipe si::es 12' thru 36' to be nominal OD, with minimum .25" wall, per AWWA C-200.
I
GENERAL
CONTRACTORS
SlIPERIOR SERVICES WITH AN EXCEPTIONAL TRAM
March 10, 2000
Mr. Gary Hendricks, P.E.
Shimek, Jacobs & Finklea
8333 Douglas Avenue
Dallas, TX 75225-5816
Re:
City of Coppell, TX
Village Parkway Pump Station Additions
Sub: Request for Change Order #1
Gary,
As we have discussed in our meeting Mamh 6, 2000, we are furnishing pricing for two
changes needed for this project. Our pricing includes all labor, material and equipment
to complete this work. Our pdcing is as follows:
Install Half Inch Tap in 36'' Pipe For Pressure Transmitter
Material 43.00
Welder 150.00
Bond 4.00
15% 0 & P 30.00
Total $227.00
Change Angle of Existing 30" Bend to Match Existing Flange
Labor 350.00
40% Labor burden 140.00
Equipment 75.00
Welder 150.00
Bond 15.00
15% 0 & P 110.00
Total $840.00
Please let me know if this is acceptable. If you have any questions, please call.
Respectfully,
Steve Dake
Project Manager
SD:jr
99048co#1 .doc