Loading...
ST8806-CS 900905 GINN, INC. CONSUYLTING ENGINEERS PARKWAY BOULEVARD IMPROVEMENTS FROM ALEX DRIVE TO HEARTZ ROAD CITY OF COPPELL, TEXAS FINAL WALK THROUGH INSPECTION SEPTEMBER 5, 1990 ATTENDEES: NAME ORGANIZATION PHONE ~ J.C. Karlsruher Ginn, Inc. 248-4900 Julio Perez Centerline Constructors (817) 732-0882 Randy Nash Tucker Landscaping 436-0295 Rick Wieland city of Coppell 462-8495 Barney Boydston Centerline Constructors (817) 732-0882 J.R. Richardson Ginn, Inc. 248-4900 Tommy Koopman city of Coppell 462-8495 PUNCHLIST 1. Contractor must cap the end of the pre-existing irrigation system in the median at the east end of the project. 2. New irrigation system, Station No. 1 - raise and level valve box. 3. New irrigation system, Station No. 2 - O.K. 4. New irrigation system, Station No. 3 - Repair first sprinkler head on north side of median and east end of station. 5. Station No. 4 - O.K. 6. Station No. 5 - Check for valve leak and repair if necessary. Straighten spwinkler heads which have been run over in north side of median. 7. Station No. 6 - O.K. 8. Uncover and raise valve stack for fire hydrant at west end of project. Note: Street Department comments included as per conversation with Per Birdsall on 9/4/90 and 9/5/90. 9. Repair settlement of backfill around inlets. 17103 l'rcslon I~oad · S~lilC lO0 · I,B 118 · I)allas, 'l'cxas 75248 · Photo; 214/248-4900