Loading...
ST0701-CS101111 d � i'niL %.„..„ 9 S 1 9 November 11, 2010 Matt Oyen PacTrust 15350 SW Sequoia Pkwy Suite 300 Portland OR 97224 RE: Southwestern Boulevard Reconstruction, Project #ST 07 -01 Final Acceptance Dear Mr. Oyen: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two -year maintenance agreement and record drawings have been received. Maturity on the agreement will be two years from the date of this letter. A follow -up inspection of the facilities will be conducted prior to the lapse of the two -year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation during the course of this project. Sincerely, � / � Rick O'Dell Keith R. Marvin, P.E. Construction Inspector Project Engineer Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works LH Lacy Company Jorge Rodriguez, P.E., Halff Associates A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV