Loading...
Arbor Manors 4R-CS101110 November 10, 2010 Bill Pantuso Huffman Builders of Denton County Fax: 940-382-8209 RE: Arbor Manors, Lot 4R1 Block A Replat Dear Mr. Pantuso: A pre-construction conference on the referenced project has been scheduled for Monday, November 15, 2010 at 1:30 p.m. in the Lobby conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at (972) 304-3685. Sincerely, Albert Samaniego Construction Inspector Office Phone: 972-304-3685 Fax: 972-304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Lee Stone, Commercial Building Inspector Tim Oates, Deputy Chief/Prevention Michael Arellano, Building Official 2 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner / owner’s representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner / owner representative’s responsibility to notify the following parties:  Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers)  Geotechnical firm  Project Engineer  Contractors or subcontractors for excavation, utility, & paving operations  SWPPP representative