ST8505-CS 861002October 2, 1986
****NAME****
***ADDRESS***
***CITY/STATE***
Dear Property
According to our records you own property along Beltline
North/South between Interstate 635, and Denton Tap. As you
may know this section of Beltline is scheduled for road
improvements by the City of Coppell in the coming weeks. .~
Therefore. we offer you the opportunity to epe&k before
City Council in a Benefit Assessment Hearing O~ ~seue~
concerning the estimated tax assessments as ~ result of
road improvable. Infornaat~on on the hear~ ~S
the following ~e .....
~e have identif~ed the following accounts and parcels o~ ~,~,~?
as being under your ownership~
1)
2)
3)
4)
5)
6)
7)
TOTAL FRONT FOOTAGE
TOTAL ASSESSMENT
The assessment rate of 8130.56 per linear fast ~e tho
rate as se~ by the City Council at their meeting on
26, ~1986. The maximum rate allowable by law ~s
front foot. Although the City plans to build a
the assessments are based on the cost for
the C~t¥ and the County p~c~lng up the
Construction w~l! beg~n after the Public Hearing. A~
notices are delivered durLng the construction 9er~od0
your first payment is due within 30 days afl.er
the road work by the City Council.
You will probably have several questions and comments abou~ ~,
this project, and we look forward to hearing your ~houghts OW/
thio matter at the Public Hearing.
Sincerely,
The Coppell City Council
NOTICE OF PUBLIC HEARING
October 21, 1986
MEETING TIME:
7:30 P.M.
City Hall Town Center
255 Parkway Boulevard
Notice is hereby given that the City Council of the City of
Coppell will hold a Public Hearing at 7:30 p.m. at the City
Hall (Coppell Town Center) at 255 Parkway Boulevard on the
21st day of October, 1986 as to the amount to be assessed
against each abutting property owner, railways, and street
railways, if any, or their agents or attorneys and to all
persons interested in said matter and as to the benefits to
said property by reason of said improvement or any other
matter or thing in connection therewith on the following
street:
Belt Line Road from approximately 600 feet North of
Interstate 635 to Belt Line Road East/West.
The cost of the improvements including contingencies is
$6.2?5 million, and the assessment rate is $130.56 per front
foot.
The street shall be paved from curb to curb with 9-inch
thickness reinforced 3000-pounds per square inch concrete
pavement; with i2-inch cement stabilized base; with S-inch
height integral curbs; with 6-inch thickness reinforced
concrete drive approaches; with A-inch thickness reinforced
concrete sidewalks where specified; so that there shall be
two roadways each 34 feet in width separated by a variable
width median with left turn lanes where specified; and such
improvements shall Include the construction of all necessary
storm drainage for the completion of this project.
Revised Calendar
Belt Line Road Phase 1-Assessment District
City of Coppell
September 26, 1986
Event
I. Council makes determination of
necessity to pave and orders improvements
2. Council authorizes approval of
specifications, estimate of costs, and
bid advertise~snt
3. Council approves engineer's report
4. Council calls public hearing
5. 1st publication In ~~
(other newspapers depending on publication
deadline)
6. Mailing to property owners
?. 2nd publication tn newspaper(s)
8. Award Contract
(based on recommendation from Consulting
Engineer)
9. 3rd publicat~on ~n newspaper(s)
10. Council holds Benefit Assessment
Hearing
11. Cot/nc~l Levies Assessments
Date
Sept 23
Sept 23
Sept 23
Sept 23
Sept 26
prior to Oct. 3
Oct. 3
Oct. 14
Oct. 10
Oct. 2!
Oct. 21