Loading...
Sales Tax 09-LR101119" I� 1L r LoGIYi �ru CE l All 1� G GROUP Acct ID: 1770 Report Date: 11/19/2010 Project: Heartz Road Location: Heartz Road Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 File No: C10 -1013 Date Sampled: 11/15/2010 Sampled By: Hanks, Marvin By Order Of: Ricardo Order Number: 1770 Client: The City of Coppell REPORT: Nuclear Field Density Test LAB NO: 94847 -1 Test Method: See Below TEST RESULTS Report No: 94847 -1 Page 1 of 1 Optimum Maximum Proctor Moisture Dry Density Proctor No Date (%) (pct Color / Description 8809 11/15/2010 30.6 87.7 Light Brown and Gray Sandy Clay Lime Treated Specification Moisture Band Specification No. Compaction, % Minimum Maximum 1 95 -2.0 3.0 Material: Wet Moisture Dry Percent Test Lift # / Density Content Density Proctor Spec. Moisture Proctor Pass No. D Location (p cf) % (pcf) Numbe No. Deviation Density Fail 1 Final Southbound Heartz Rd. - Station 111.2 31.3 84.7 8809 1 +0.7 96.6 Pass 1 +90 2 Final Southbound Heartz Rd. - Station 111.0 31.8 84.2 8809 1 +1.2 96.0 Pass 4 +00 3 Final Southbound Heartz Rd. - Station 110.7 32.1 83.8 8809 1 +1.5 95.6 Pass 6 +50 4 Final Southbound Heartz Rd. - Station 111.5 32.0 84.5 8809 1 +1.4 96.4 Pass 9 +25 Gauge No.: 4557 Daily Standard Counts: 11/15/2010 DS: 2998 MS: 495 Test Methods: ASTM D6938 -07 Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Ong: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin P.E. Respectfully Submitted (1 - cc co Alliance Geotechnical Group 1 -cc The City of Coppell Attn: Rhonda Adloo 1 -cc The City of Coppell Attn: Mr, Rick O'Dell t ! 3 Perry C. Kakara, Sr. Project Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION. A: GEOTECHNICML Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -1013 Date Sampled: 11/15/2010 Report Date: 11/19/2010 Sampled By: Hanks, Marvin Project: Heartz Road By Order Of: Ricardo Location: Heartz Road Order Number: 1770 Client: The City of Coppell REPORT: Lime Depth Verification LAB NO: 94847 -2 T est Met See B elow TEST RESULTS Report No: 94847 -2 Page 1 of 1 A field representative for Alliance Geotechnical Group, checked the depth of lime treatment of the subgrade after compaction. Depth measurements were performed using a phenolphthalein indicatior to verify compliance with project specifications that require a minimum 6 in. compacted thickness. The test results follow. Sample Depth, No. Location in. 1 Southbound Heartz Rd. - Station 1 +90 _ 6.25 2 Southbound Heartz Rd. - Station 4 +00 6.50 3 Southbound Heartz Rd. - Station 6 +50 6.25 4 Southbound Heartz Rd. - Station 9 +25 6.50 Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Ong: The City of Coppell (Coppell TX) Attn: Mr, Keith Marvin, P.E. (1 -cc copy) 1 -cc The City of Coppell Attn: Rhonda Adloo 1 -cc The City of Coppell Attn: Mr. Rick O'Dell Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakara, Sr. Project Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLES) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES. NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED_ THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE MOTTO BE REPRODUCED 1MTHOUT VtrRITTEN PERMISSION