Loading...
ST0301A-CR101103 ■ TT H E •C 1 T TLL Y •O F AVERAGE FIELD FORCE C OPP �y L T T NAME OF CONTRACTOR NON- MANUAL REMARKS MANUAL JRJ PAVING, LP 2, "; q VISITORS X A S ' 8 TIME REPRESENTATIVE REPRESENTING REMARKS PROJECT: W. BETHEL ROAD (Denton Tap to Penfolds Ln) - PROJECT NO. ST 03 -01, Phase H -A OWNER: CITY of COPPELL EQUIPMENT AT THE SITE: CONTRACTOR: JRJ PAVING, LP CONSTRUCTION ACTIVITIES: WEATHER SUN CLEAR OVERCAST R S ( ' TEMP To 32 32 -50 50 -70 70-85 85 up WIND Still Mo High Report No HUMIDITY Dry Mod Humi M T W T F S S DATE /1 / 1 ENGINEERING DEPT. INSPECTOR