Loading...
ST0301A-CR101111 T H E •c 1 T Y •0 F AVERAGE FIELD FORCE C O P P E L L NAME OF CONTRACTOR NON- MANUAL REMARKS MANUAL JRJ PAVING, LP • o VISITORS e 9 X A s 1 8 TIME REPRESENTATIVE REPRESENTING REMARKS PROJECT: W. BETHEL ROAD (Denton Tap to Penfolds Ln) PROJECT NO. ST 03 -01, Phase II -A OWNER: CITY of COPPELL EQUIPMENT AT THE SITE: CONTRACTOR: JRJ PAVING, LP CONSTRUCTION ACTIvTF WEATHER SUN CLEAR OVER RAIN SNOW Peor(40 f / / . 3e TEMP To 32 32 -50 50-70 70 -85 85 up 0 P1 ri h /9 7 ` WIND Still Mod High Report No HUMIDITY Dry Mod Ilium(' M T W ( ZT S S '� e ENGINEERING DEPT. INSPECTOR