Loading...
WA9601B-CS 990402 CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. ~ RONALD V. CON'vVAY, P.E. JOHN W. BIRKHOFF, P.E. " JOER. CARTER, P.E. ~ ~X~{ April 2, 1999 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. ~ Fox Contractor nc. Post Office ox 951 Midlot ' , 65 Re: City of Coppell Sandy Lake Road Water Line lid ~q ['' O I ~ Change Order Number 1 Gentlemen: We are enclosing five copies of Change Order Number 1 to your contract with the City of Coppell for the construction of the Sandy Lake Road Water Line, from Denton Tap Road to the Wagon Wheel Ranch Elevated Storage Tank. Change Order Number 1 covers the additional work required to re-bore the first 40 linear feet of Denton Tap Road due to the conflict with the existing 16 inch water line. Please sign and return all five copies to our office for further execution by the City. We will return two fully executed copies to you once signed by the City of Coppell. We are available to discuss this project further at your convenience. Gary C. Hendricks, P.E. Enclosure cc: ~r. Ke~eth M. Griffin, P.E. Mr. Larry Davis \\engineering\.sj~-sjf-v~~2.sj~pr~jects\c~erica~\c~ppe~~\96~~5~\~etters\c~nst\k\c~-~d~c CITY OF COPPELL, TEXAS Sandy Lake Road Water Line Wagon Wheel Ranch Elevated Tank to Denton Tap Road CHANGE ORDER NO. 1 A. INTENT OF CHANGE ORI;).ER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Fox Contractors, Inc., P.O. Box 951, Midlothian, Texas 76065, for construction of the Sandy Lake Road Water Line - Wagon Wheel Ranch Elevated Tank to Denton Tap Road, dated December 8, 1998. B. DESCRIPTION OF CHANGE Due to conflict with the existing 16-inch waterline and the proposed 24-inch waterline underneath the northbound lanes of Denton Tap Road, approximately 40-linear feet of installed 36-inch encasement pipe is to be removed and re-bored at a lower grade. See the attached revised construction drawing. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change order will have the following effect on the cost of this project: No. Description Quantity This C.O. Quantity Unit Unit Price of Change 41 Re-Bore 36" Encasement Pipe due to 0 1 1 L.S. $17,500.00 $17,500.00 Conflict with Existing 16" Watefiine Original Contract Amount $912,243.50 Change Order No. 1 17,500.00 Revised Contract Amount $929,743.50 D. EFFECT OF CHANGE ON CONTRACT TIME The work required under this change order will not add any calendar days to this project. Original Contract Time 200 calendar days Change Order No. 1 0 calendar days Revised Contract Time 200 calendar days j:xclericalXeoppeltX96-1S0xspecsXchange-oXco-l.doc (4/2/99) Page 1 of 2 E. AGREEMENT By the signatures below, duly authorized agents of the City of Coppell, Texas and Fox Contractors, Inc., do hereby agree to append this Change Order No. 1 to the original contract between themselves, dated December 8, 1998. City of Coppell, Texas Fox Contractors, Inc. Owner Contractor By: By: Date: Date: Attest: Attest: j:XelericalXeoppellX96-150XspecsXchange-oXco-l.doe (4/2/99) Page 2 of 2 ., .... CITY OF COPPELL, TEXAS Sandy Lake Road Water Line Wagon Wheel Ranch Elevated Tank to Denton Tap Road CHANGE ORDER NO. 1 A. E~E~ OF CHANGE OPenER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Fox Contractors, Inc., P.O. Box 95 1, Midlothian, Texas 76065, for construction of the Sandy Lake Road Water Line - Wagon Wheel Ranch Elevated Tank to Denton Tap Road, dated December 8, 1998. B. DESCRIPTION OF CHANGE Due to conflict with the existing 16-inch waterline and the proposed 24-inch waterline underneath the northbound lanes of Denton Tap Road, approximately 40-linear feet of installed 36-inch ~ncasement pipe is to be removed and re-bored at a lower grade. See the attached revised construction drawing. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change order will have the following effect on the cost of this project: No. Description Quantity This C.O. Quantity Unit Unit Price of Change 41 Re-Bore 36" Encasement Pipe due to 0 1 1 L.S. $17,500.00 $17,500.00 Conflict with Existing 16" Waterline Original Contract Amount $912,243.50 Change Order No. 1 17,500.00 Revised Contract Amount $929,743.50 D. EFFECT OF CHANGE ON CONTRACT TIME The work required under this change order will not add any calendar days to this project. Original Contract Time 200 calendar days Change Order No. 1 ~ 0 calendar days Revised Contract Time 306"' calendar days (4/'2/99) Page I of 2 E. AGREEMENT By the signatures below, duly authorized agents of the City of Coppell, Texas and Fox Contractors, Inc., do hereby agree to append this Change Order No. 1 to the original contract between themselves, dated December 8, 1998. City of Coppell, Texas Fox Contractors, Inc. By: ~ By: ~~~ j:~,~:~W~4~J.d~ (4/2/99) Page 2 of 2