Loading...
Sales Tax 09-LR101123Wour Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444-8889 Fax: (972) 444-8893 Acct ID: 1770 File No: C10 -1013 Report Date: 11/23/2010 Previously Reported: 11/18/2010 Project: Heartz Road Location: South Bound Heartz Road STA 11 +75 Client: The City of Coppell REPORT: Proctor Date Sampled: 11/11/2010 Sampled By: Tim Gatton By Order Of: Larry Order Number: 1770 LAB NO: 94750 -1 TEST RESULTS 97 93 v 89 _- T 0 85 c� 81 77 Atterberg Limits: LL = 52 PL = 38 Remarks: Sample #8809 Test Method: ASTM D -698 Method -A Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Ong: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -cc copy) 1 -cc The City of Coppell Attn: Rhonda Adloo 1 -cc The City of Coppell Attn: Mr. Rick O'Dell lw� OMC, W 30.7 MDD, pcf: 88.3 Description: Lime Treated Gray Clay Desc. of Ram.: Mechanical Prep. Method: Dry Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakara, Sr. Project Manager Report No: 94750 -1 Page 1 of 1 THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLES) TESTED .AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES. NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED- THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED 4UTHOUT LNRITTEN PERMISSION. 73 17 19 21 23 25 27 29 31 33 35 37 39 41 43 Moisture Content (1/0)