Loading...
ST0301A-CS101123 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Memo to File From: Larry Davis, Construction Inspector Date: November 23, 2010 RE: Bethel Rd bridge reopening ST 03-01 II, Phase A As of 4:00 p.m. this date, the reconstructed bridge over Grapevine Creek was reopened to two-way traffic. For the next approximately 30 days, JRJ Paving will continue to do work activities behind the curb until the project is complete and accepted. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"