ST8804-CS 911115November 15, 1991
Mr. Bill Anderson
Dan M. Dowdey & Associates
16250 Dallas Parkway, Suite 100
Dallas, Texas 75248-2684
Re: Final Acceptance
Heartz Road from Sandy Lake Road to Parkway Blvd.
Dear Mr. Anderson:
A final inspection of the above referenced project has been confirmed by
representatives of the City of Coppell.
Paving and utilities have been verified and are in compliance with the
City of Coppeil standard requirements.
Please follow the Erosion Control Ordinance as adopted by the City of
Coppell during the maintenance bond period.
The one-year maintenance bonds and as-built drawin§s have been received
from the contractor. Maturity on the bonds will be one year from the date
of this letter (November 15, 1992).
SincereJ37~
Larry Davis ~'~
Construction Inspector
CLD/bd
cc: M. Shohre Daneshmand, Acting City Engineer
Gary L. Sieb, Director of Planning and Community Services
Howard Pafford, Water Superintendent
Rey Gonzales, Street Superintendent
Rick Wieland, Parks and Recreation Manager
Taryon Bowman, P&Z Coordinator
Ben dela Cruz, Engineer Technician
Mike Allen, Allen Property Corporation
Tom Wise, Wiseco