Loading...
ST8804-CS 911115November 15, 1991 Mr. Bill Anderson Dan M. Dowdey & Associates 16250 Dallas Parkway, Suite 100 Dallas, Texas 75248-2684 Re: Final Acceptance Heartz Road from Sandy Lake Road to Parkway Blvd. Dear Mr. Anderson: A final inspection of the above referenced project has been confirmed by representatives of the City of Coppell. Paving and utilities have been verified and are in compliance with the City of Coppeil standard requirements. Please follow the Erosion Control Ordinance as adopted by the City of Coppell during the maintenance bond period. The one-year maintenance bonds and as-built drawin§s have been received from the contractor. Maturity on the bonds will be one year from the date of this letter (November 15, 1992). SincereJ37~ Larry Davis ~'~ Construction Inspector CLD/bd cc: M. Shohre Daneshmand, Acting City Engineer Gary L. Sieb, Director of Planning and Community Services Howard Pafford, Water Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager Taryon Bowman, P&Z Coordinator Ben dela Cruz, Engineer Technician Mike Allen, Allen Property Corporation Tom Wise, Wiseco