Loading...
ST0004-CS011126 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, Director of Engineering Glenn Hollowell, Asst. Director of Public Works From: Larry Davis, Construction Inspector Date: November 26, 2001 RE: Rescheduled WALK-THRU Freeport Parkway Reconstruction ST 00-04 The final walk-thru on the referenced project has been re-scheduled for Tuesday, December 4, 2001 at 2: 00 p.m. If I can be of further assistance please let me know. cc: Jim Evans, Quantum Contracting, Inc. fax 972-722-1114 "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"