ST0004-CS011126
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
From:
Larry Davis, Construction Inspector
Date: November 26, 2001
RE: Rescheduled
WALK-THRU
Freeport Parkway Reconstruction ST 00-04
The final walk-thru on the referenced project has been re-scheduled for Tuesday, December
4, 2001 at 2: 00 p.m.
If I can be of further assistance please let me know.
cc: Jim Evans, Quantum Contracting, Inc. fax 972-722-1114
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"