Loading...
ST0102-CS030117T H E • C 0 T Y( O F COPPELL isk k-N- January 17, 2003 A s Brook Barefoot Development Services Manager Duke Construction 5495 Belt Line Road, Suite 360 Dallas, TX 75254 RE: Ruby Road Project ST 01 -02 Change Order #I Dear Mr. Barefoot: With this letter, I am providing 3 originals of Change Order #1 for the referenced project. Change Order #1 includes the installation of the proposed drive approaches off of Ruby Road. Please sign the change order and return the 3 originals to me for execution. If you have any questions or need any additional information please give me a call at your convenience. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office Phone: (972) 304 -3686 255 PARKWAY * P.0.80X 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673