ST0102-CS021028
Ruby Road
The City of Coppell is in the process of accepting bids for the
reconstruction of Ruby Road. The improvements consist of the
reconstruction of the existing 2-lane asphalt road to a 2-lane
undivided concrete roadway with improved storm drainage, and the
installation of water and sewer facilities.
It will be necessary to remove trees within and adjacent to the
existing right-of-way. The trees scheduled for removal are marked
and will be removed prior to the start of construction. Golden Tree
Maintenance Company will start to remove the trees during the week
of October 21, 2002. Depending on the weather, it should take
approximately two weeks for tree removal.
If you have any question, please contact Garreth Campbell, Project
Inspector, at 972/304-3685 or Suzan Taylor in Engineering at
972/304-7019.