Loading...
Sales Tax 09-CS101203 T H E C 1 T Y O F COPPELL * A S , 8 December 3, 2010 Jerry Conatser Conatser Construction TX, LP 5327 Wichita St Fort Worth TX 76119 RE: Sales Tax 2009 Street Reconstruction — Dobecka Drive Final Acceptance Dear Mr. Conatser: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two -year maintenance bonds and record drawings have been received. Maturity on the bonds will be two years from the date of this letter. A follow -up inspection of the facilities will be conducted prior to the lapse of the two -year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation during the course of this project. Sinc-r- Alb-rt Samaniego Construction Inspector Office Phone: (972) 304 -3685 Fax: (972) 304 -3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Tim Oates, Deputy Chief /Prevention Jennifer Armstrong, Finance Director A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV