Loading...
SW0801-CS101206 T H E •C 1 T Y •O F COPPELL A S 1 S December 6, 2010 Mr. & Mrs. Timothy Plata 150 E. Bethel Road Coppell, TX 75019 RE: SW 08 - 01 Denton Tap Sidewalk In - fill Project Dear Sir or Madam: As part of the Denton Tap Sidewalk In -fill Project currently underway, we are also in- filling where portions of sidewalk are missing near intersecting streets. Construction is complete along Braewood Drive and our plan is to begin on Bethel Road soon to fill in the missing gap of approximately 150 feet of sidewalk in the right of way between Salon on the Creek and the existing sidewalk along Bethel Rd east of Denton Tap. It is anticipated that the contractor will begin work in the next few weeks. If during construction you need to contact the contractor, please use the following contact information: 3D Paving and Contracting, LLC Roger Dupre P.O. Box 1698 Coppell, TX 75019 972 - 393 -1876 If you have any questions or concerns, either now or during the course of construction, please contact me at the below listed information, or the construction inspector, Larry Davis at 972- 304 -3684. Sincerely, George S. Marshall, PE, CFM City of Coppell Engineering Department 972 - 304 -3562 gmarshal lAcoppel ltx.gov A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV