ST8804-CS 910830 · ALLEN PROPERTY CORPORATION 12770 COlT ROAD · SUITE 1215 · DALLAS, TEXAS 75251 Telephone 214-233-5771 / Fax 214-233-5881 August 30, 1991 .. GityCity of Engin~r~ppel, P.O. ~x 478 Cop~ell~as 75019 Re: Heaa~ Road Extension-City Acceptance Dear Shohre: I am writing this letter for the purpose of answering several questions I understand that~o.u have raised with respect t0 the ~mpletion and a~eptance of Hea~ Road which were not ~vered i6 your lett-~[' t~-'T°m Wise of July 31 1991 as f0116ws: Responsibility for Sidewalks Across Box Culvert - As with all of the area along Heartz which is not in the Park Place Addition, the responsibility for ~nstruction of sidewalks will be imposed on the developers of those properties at the time their property is platted or at the time that building permits are issued on their developed sites. The actual frontage where the box culvert is located on the west side of Hea~ Road is owned by the Parks of Coppell Trust. The frontage on the east side of Heartz Road is owned by ABQ Federal Savings Bank. As those areas are platted, the sidewalk requirement should be addressed at that time. Siltation of East Pond - As I am sure you are aware, the City approved in conjunction with the platting ~_ P~r~ ~Place a~~6[d~[~[-60th ~6]~a{S~0oidb-~ [!!0Wed t6 use the Privaie recorded drainage easement, which is an agreement between ABQ and the P~rks 0f Coppell J6int Venture and their successors and assigns (the "Mutual Drainage Easement"), as a point of discharge for the drainage facilities constructed with Hea~z Road and Park Place. The pond east of Heartz Road in question is pall of the area included in the Mutual Drainage Easement. The City authorized use of the Mutual Drainage Easement in its existing condition in Mr. Ratliff's letter to me of October 5, 1990, as further clarified in Mr. Ratliff's letter of October 8, 1990. The maintenance of the Mutual Drainage Easement in such a manner that it continues to function is the direct responsibility of the owner of the property through which any portion of the channel may be located, being either Parks of Coppell Trust or ABQ. However, as developer of Park Place, Allen Prope~y Corporation will agree on a limited basis to remove any necessary siltation or blockage in the east pond which is causing the disfunction of the storm drainage system in Park Place as needed, on the following ~nditions: - 3 I99t Ms. Shohre Daneshmand, P.E. August 30, 1991 Page 2 1. The maintenance responsibility period shall be limited to one year from the date of final acceptance of the Park Place Addition or until July 8, 1992 (the "Maintenance Period"). At the current rate of construction of homes occurring in the Park Place Addition, the subdivision would have homes commenced on all of the lots in approximately nine months. As landscaping is established, the contribution to the siltation problem from the Park Place Addition should cease. 2. If other property commences development in the drainage area which flows into the east pond during the Maintenance Period, the City will agree to require of that developer a similar responsibility for correcting such siltation problems. 3. Should there be a disagreement over the extent to which a problem should be corrected during the Maintenance Period, we will agree to abide by the decision of Dan Dowdey & Associates, Civil Engineers as to the required degree of maintenance. Remaining Heartz Road Fees - Enclosed is a copy of a Public Works memorandum dated October 4, 1992 setting forth the construction fees for the Heartz Road extension. Those fees remaining unpaid at this time are the street light assessment and street sign assessment, being a total of $4,417.18. We have enclosed our check for these fees with Larry Davis' copy of this letter. I assume Larry will ask the accounting departmen~'t(~'-retU-7-h-~'rbceipt to us. If you have any questions on the above, please feel free to call. Yours very truly, Al ~ ~N PROPERTY CORPORATION Michael R. Allen, President MRA/kcb Enclosure cc: Mr. Larry Davis Mr. Bill Anderson Mr. Tom Wise Mr. Richard Dooley PP/s.daneshmand/8.13.91 COPPELL PUBLIC WORKS DATE= October 4, 1990 TO= File FROM: Public Works Staff I~: Construction Fees fo~ Heartz Road North of Sandy Lake Construction Permit Fees - $600,000 Construction cost x 2% - $12,000.00 ~-~ 100% Due at t/me of pre-construction conference. ~treet Liqht Assessment - $292.60 per light for every200 feet of roadway. You are being assessed for 2858 feet of roadway, which totals to 14 lights. - $292.60 x 14 lights = $4,096.40 100% Due prior to acceptance of Street Construction ~treet Sign Assessment SIGN UNIT PRICE OUANTITY EXTENDED PRICE No Parking $53.10 0 $ - Speed Limit 63.54 2 127.08 Yield 58.56 0 - Stop 65.12 0 - Street Name 11.60 0 - Stop & Street Combo 96.85 2 _193-70 Total $320.78 100% Due prior to acceptance of Street Construction. cc: Frank Trando, Finance Director Larry Davis, Public Works Inspector ALLEN PROPERTY CORPORATION 0 ~_ 3 8 .. HEARTZ RD. 12770 COlT RD., STE. 1215 8--13 ~'9 91 32-61/1110 DALLAS, TX 75251 ...... 0t0-01O Pay to the Ordero[ City of Cop~ll J $1 4417 18 J Forty fo~ h~ed seventeen ~d 18/100 -- Dollars BANK~ON~ BANK ONE, TEXAS, NA S~eet Lxght-¢qU~b. 40 For g~r~et Si~ -$ 220~78 ~ ,. . . ~_,~ Oa,e ?-~ ~9 q/ 0011532 Received From ~L..~r~-. Address Dollars $ A~T, OF CASH ~T. PAID CHECK B~L~CE MO~EY DOE ORDER