Loading...
Tennis Ctr Exp-LR101207Professional Service Industries, Inc. 4087 Shilling Way Dallas, TX 75237 Texas Firm Registration No. F-03307 Phone: (214) 330-9211 Fax: (214) 333-2853 Report No: CON:0341284-36-C1 Concrete Test Report Issue No: 2 Client:CC: SCHMOLDT CONSTRUCTIONCARY SCHMOLDT These test results apply only to the specific locations and materials noted and may not represent any other locations or elevations. This report may 5797 CR 126, SUITE ACHRIS HOUSE not be reproduced, except in full, without written permission by CELINA, 75009GEORGE MARSHAL Professional Service Industries, Inc. HILLARY WHITE JOHN ELIAS Project: COPPELL TENNIS CENTERJOHN FIELDER COPPELL, TX LARRY DAVIS Approved Signatory: Ronald Yeoman (Project Manager) LEE STONE Date of Issue:12/7/2010 Mix Data Supplier Mix Identification Specified Design Strength (psi) 3000at age28days Details of Sample Date SampledDate ReceivedMeasuredSpecified 11/8/201011/9/2010 Slump (in) General LocationPiersSlump w/ plasticizer (in) N/A Piers, Location provided by conctractor Sample LocationAir Temp (°F) Curing MethodConcrete Temp (°F) One day Field/Laboratory Cure ASTM C 1064 Field Sample NoField Cure Temp (°F)HighAir Content (%) ASTM C 231 LowUnit Weight (pcf) ASTM C 138 ContractorBatch Size (yd³) Truck No.Ticket No.Water Added (gal)Before Sampled ByAfter Contractor Submitted ByTime Batched Contractor WeatherTime Sampled Clear Est. Wind (mph)Yd³ PlacedTime Placed Est. Rh (%)Time In Truck (mins) Compressive Strength of Concrete CylindersASTM C 39 Specimen IDDate TestedAgeDimensions (in)Area (in²)Type ofUltimateType ofCompressiveRequired (days)CapLoad (lbf)FractureStrength (psi)Strength (psi) DiameterHeight 0341284-36-C1\111/15/1075.9912.0028.18U6465022290 0341284-36-C1\211/15/1075.9912.0028.18U6493022300 0341284-36-C1\312/06/10285.9912.0028.18U90030231903000 0341284-36-C1\412/06/10285.9912.0028.18U93540233203000 NotesRemarks 1.Sampling to ASTM C 172FailureMode: 2 = C39: Vert crack/ cone opposite end; C1314: Cone & Shear 2.Specimen(s) Prepared to ASTM C 31 3.Capping B=Bonded ASTM C 617, U=Unbonded ASTM C 1231, C = Combined Form No: 18970.V1.00, Report No: CON:0341284-36-C1(c) 2000-2009 QESTLab by SpectraQEST.com Page 1 of 1 _ Professional Service Industries, Inc. Information 4087 Shilling Way Dallas, TX 75237 M l 1 j/7 Texas Firm Registration No. F -03307 •lT oL ]�(/GI([ On Phone: (214) 330 -9211 Engineering • Consulting • Testing Fax: (214) 333 -2853 Report No:RSI:0341284 -38/1 Reinforcing Steel Inspection Report IssueNo:1 Client: SCHMOLDT CONSTRUCTION CC: CARY SCHMOLDT, These test results apply only to the spedfic locations and materals noted and 5797 CR 126, SUITEA CHRIS HOUSE, may not represent any other locations or elevations. This report may not be reproduced, except in full, without written permission by Professional Service GEORGE MARSHAL, Industries, Inc. CELINA, 75009 HILLARY WHITE, � JOHN ELIAS, JOHN FIELDER, LARRY Project: COPPELL TENNIS CENTER DAVIS, LEE STONE COPPELL TX Approved Signatory: Ronald Yeoman (Project Manager) Date of Issue: 12/8/2010 Date: 12/7/2010 Technician: Quwan Shields Location ❑ Footing ❑ Slab -on -grade ❑ Elevated slab ❑ Piers ❑ Columns ❑ Beam ❑ Pilaster ❑ Wall Panel ❑ Foundation Wall ® Other Building /Unit No. N/A Elevation: N/A Specific Location (grid lines): Flatwork /Sidewalks between tennis courts 5, 9, and 12 Plans Used: ❑ Contract Drawings ❑ Approved Shop Drawings Current Date and Revision /Submittal No. on Drawings: N/A Drawing (page) and Detail Nos.: N/A Item Yes No N/A Item Yes No N/A Size & number of bars as specified ❑ ❑ ® Bars properly tied and positioned ❑ ❑ El Lap lengths as specified ❑ ❑ ® Bars properly supported on chairs,... ® ❑ ❑ Spacing of bars as specified ❑ ❑ ® Bars clean (no foreign matter) ® ❑ ❑ Dowels in place and tied ® ❑ ❑ Clearance around rebar as specified ❑ ❑ Epoxy coating specified ❑ ❑ ® Rebar epoxy coated ❑ ❑ El Non - Conformance Items Description Who Notified How / Date Corrected Remarks: No plans on site for flatwork per Chris with Schmoldt Construction. Technician observed #3 rebar @ 12" O.C. Rebar was properly chaired, and the dowels and redwood were in place at the control joints. Page 1 of 1