Loading...
ST8804-CS 910731 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 July 31, 1991 Mr. Tom Wise Wiseco 618 East NW Highway Grapevine, TX 76051 Re: Heartz Road Paving and Drainage Dear Mr. Wise: As has been discussed with you in previous meetings regarding the completion of Heartz Road, the items listed below need to be completed before a final walk-thru can be conducted on the project. 1. The streetscape plan is to be followed as noted on the mark-up plans. (Brick pavin§ section) 2. Traffic button placement. 3. Grading of parkway along the east side of Heartz Road from Station 0 + 90 to Station 3 + 00. 4. Grading of parkway along the west side of Heartz Road from Station 0 + 90 to Station 6 + 00. 5. Grading of the parkway along the east side of Heartz Road from Station 13 + 00 to Station 22 + 00. 6. Grading of the parkway along the west side of Heartz Road from Station 13 + 00 to Station 22 + 00, including the upstream portion of the channel into the box culvert. 7. Grade to drain the area of the existing channel along Heartz Road east side. This area of drainage has been limited because of construction on Heartz Road. 8. The concrete paving section at Heartz Road and Parkway Boulevard is holding water. Letter to Mr. Tom Wise July 31, 1991 Page 2 Please address the above listed items so that a walk-thru can be scheduled at the earliest convenient time. If you have any questions, please contact me at 393-1016. Construction Inspector CLD/Bd cc: Mike Allen, Allen Property Corporation M. Shohre Daneshmand, Acting City Engineer Gary L. $ieb, Director of Planning and Community Services Ben dela Cruz, Engineer Technician WISELTR