Loading...
ST0301A-CS101217T H E C I T Y O F COFFELL As.�a o December 17, 2010 Marty Murphy JRJ Paving martym@ RE: Project #ST 03 -01A Bethel Road (Denton Tap to Penfolds) Final Walk- through Inspection of Improvements Dear Mr. Murphy: Please be advised that a walk - through is scheduled for Tuesday, December 21, 2010 at 9:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you have any questions, please call 972- 304 -3684 at your earliest convenience. Sincerel Larry avis Cons ction Inspector Office Phone: (972) 304 -3684 Fax: (972) 304 -7041 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Keith Marvin, P.E., Project Engineer Glenn Hollowell, P.E., Asst. Dir. of Public Works Streets Dept. Utilities Dept. Tim Oates, Deputy Chief /Prevention Caleb Thornhill, Freese & Nichols Dean Dumke, JRJ Paving A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV