SW0801-CN101222CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: SW08 -01 Denton Tap Infill CONTRACTOR: 3D Paving and Contracting, L.L.C. OWNER: City of Coppell CHANGE ORDER NO.: 1 DATE: 12 -22 -2010 Item Description Quantity Unit Unit Price Total ADD: 23 Grading & Sod at 1 LS $4,516.44 $4,516.44 120 S. Denton Tap (Town Oaks Center) DELETE: 13 Retaining Wall (225) SF $20.00 (4,500.00) Total Revision to Contract Amount $16.44 Original contract amount $ 231,754.00 Net increase by previous authorized Change Orders $0.00 Revised Contract amount prior to this Change Order $231,754.00 Net increase in contract amount $ 16.44 Revised contract amount $ 231,770.44 Cumulative increase in TOTAL change order amount (Percentage) <1% Net increase in contract time of completion 5 calendar days Revised Contract time of completion 1 55 calendar days The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. / A� /- P..Zd 1 . 6. 11 R kornmended byl6ty Engineer Date / 7- Agr ed to by CoITtractor Date 4 /' � Z Accep d by City Date 3D Paring and Contracting, LLC P.0, BOX 16982 1'OPPELL, TX. 750 OFFICE: 972- 393 -2876 AX- 97% -393 -1865 December 20, 2010 DENTON TAP SIDEWALK iNFILL Supply equipment, material, and labor to complete the following scope of work: Shape the landscape along 120 Denton lap at Town Oaks Center approx. 20OLF and install approx. 2,4005F of sod to match existing (Tiff 917): SOD: S680.8S Nate :Add 5 cal. Days to existing contract. EQUIPMENT: $525.00 TRUCKING. $650.00 LABOR: $2,250.00 PROFIT & OVERHEAD: $410.59 TOTAL $4,516. R r Dupre nagfig PartOr Page 1 of 1 George Marshall - SW08-01 Denton Tap Sidewalk From:   George Marshall To:   roger_3dcontracting@verizon.net Date:   12/22/2010 9:19 AM Subject:   SW08-01 Denton Tap Sidewalk   Roger,   In regards to the change order presented to us for the grading work at 120 S. Denton Tap.  I would like for you to add a reduction in retaining wall quantity of 225 sf at $20/sf = $4500.  This should still leave us with plenty of retaining wall to complete the project.  If you could change your change order back to 1) a lump sum for grading & sod work and 2) a reduction in retaining wall.   Thank You, George file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4D11C2BBCity_...11/4/2011