Tennis Ctr Exp-LR101222Professional Service Industries, Inc.
4087 Shilling Way
Dallas, TX 75237
Texas Firm Registration No. F-03307
Phone: (214) 330-9211
Fax: (214) 333-2853
Report No:RSI:0341284-43/1
Reinforcing Steel Inspection Report
Issue No:1
CARY SCHMOLDT,
Client: CC: These test results apply only to the specific locations and materials noted and
SCHMOLDT CONSTRUCTION
may not represent any other locations or elevations. This report may not be
CHRIS HOUSE,
5797 CR 126, SUITE A
reproduced, except in full, without written permission by Professional Service
GEORGE MARSHAL,
Industries, Inc.
HILLARY WHITE,
CELINA, 75009
JOHN ELIAS, JOHN
FIELDER, LARRY
Project:
COPPELL TENNIS CENTER
DAVIS, LEE STONE
Approved Signatory: Ronald Yeoman (Project Manager)
COPPELL TX
Date of Issue: 12/22/2010
Date: Technician:
12/21/2010 Kiley Brown
Location
Footing Slab-on-grade Elevated slab Piers Columns
Beam Pilaster Wall Panel Foundation Wall Other
Sidewalk and Flatwork
Building/Unit No. Pro Shop
Elevation: FG
Specific Location (grid lines): Below
Plans Used: Contract Drawings Approved Shop Drawings
Current Date and Revision/Submittal No. on Drawings: 6/3/10
Drawing (page) and Detail Nos.: L4 Plan, L5 Detail
Item Yes No N/A Item Yes No N/A
Size & number of bars as specified Bars properly tied and positioned
Lap lengths as specified
Spacing of bars as specified Bars clean (no foreign matter)
Dowels in place and tied Clearance around rebar as specified
Epoxy coating specified Rebar epoxy coated
Non-Conformance Items
Description Who Notified How / Date Corrected
Rebar was not properly chaired throughout the Chris w/Schmoldt Chairs were added prior to the placement of
entire area. Construction concrete on same day.
Remarks:
and from to Building Addition; .
Page 1 of 1
Professional Service Industries, Inc.
4087 Shilling Way
Dallas, TX 75237
Texas Firm Registration No. F-03307
Phone: (214) 330-9211
Fax: (214) 333-2853
Report No: SDFR:0341284-42/1
Summary Daily Field Report
Issue: 1
CARY SCHMOLDT,
Client: CC: These test results apply only to the specific locations and materials noted and
SCHMOLDT CONSTRUCTION
may not represent any other locations or elevations. This report may not be
CHRIS HOUSE,
5797 CR 126, SUITE A
reproduced, except in full, without written permission by Professional Service
GEORGE MARSHAL,
Industries, Inc.
HILLARY WHITE,
CELINA, 75009
JOHN ELIAS, JOHN
FIELDER, LARRY
Project:
COPPELL TENNIS CENTER
DAVIS
Approved Signatory: Ronald Yeoman (Project Manager)
COPPELL TX
Date of Issue: 12/22/2010
Date:
12/15/2010
WEATHER:
CLEAR
TEMPERATURE RANGE: TO
60 70
PSI REPRESENTATIVE:
KIRK SEE
TYPE OF INSPECTION BEING PERFORMED
SOILS CONCRETE
FOUNDATIONS BATCH PLANT
CONTROLLED FILL (COMPACTION) PLACEMENT (JOB SITE)
CYLINDER PICK-UP
ASPHALT OTHER
BATCH PLANT
PLACEMENT (JOB SITE)
BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE:
On this date, our representative picked up and transported (1) set of (4) concrete test cylinders to the laboratory for curing
and testing.
Page 1 of 1