Loading...
Tennis Ctr Exp-LR110107Professional Service Industries, Inc. 4087 Shilling Way Dallas, TX 75237 Texas Firm Registration No. F-03307 Phone: (214) 330-9211 Fax: (214) 333-2853 Report No: PST:0341284-49/1 Post Tension Report Issue No:1  CARY SCHMOLDT, Client: CC: These test results apply only to the specific locations and materials noted and SCHMOLDT CONSTRUCTION may not represent any other locations or elevations. This report may not be CHRIS HOUSE, 5797 CR 126, SUITE A reproduced, except in full, without written permission by Professional Service GEORGE MARSHAL, Industries, Inc. HILLARY WHITE, CELINA, 75009  JOHN ELIAS, JOHN FIELDER, LARRY Project: COPPELL TENNIS CENTER DAVIS, LEE STONE,  Approved Signatory: Ronald Yeoman (Project Manager) COPPELL TX LOUIE LAUCK, Date of Issue: 1/7/2011 Date: Technician: 1/4/2011 Kirk See Location: Floor: Practice Court Pour: Serial No. of Gauge: Serial No. of Ram: 313993 022101 Strand Heat No: Strand MFG.: Contractor: Approved Drawings : (Strand Placement Shop Drawings) Stressed By: Verified By: Kirk See TENDON GAUGE PRESSURE CALC MEASURED ELONGATION % NO. ELONG JACKING LIFT OFF END 1 END 2 TOTAL 1/S-104 7850 8.380 8.000 0.000 8.000 -4.5 2/S-110 7850 8.880 9.000 0.000 9.000 1.4 3/S-117 7850 7220 9.380 8.160 0.750 8.810 -6.1 4/S-122 7850 9.750 9.440 0.000 9.440 -3.2 5/S-126 7850 7200 10.000 9.400 0.250 9.500 -5.0 6/S-126 7850 6800 10.000 9.13 0.500 9.630 -3.7 7/S-126 7850 6800 10.000 9.380 0.000 9.380 -6.2 8/S-126 7850 6800 10.000 9.560 0.000 9.560 -4.4 9/S-126 7850 6800 10.000 9.560 0.000 9.560 -4.4 10/S-126 7850 6800 10.000 9.750 0.000 9.750 -2.5 11/S-126 7850 6800 10.000 9.880 0.000 9.880 -1.2 12/S-126 7850 6800 10.000 9.630 0.000 9.630 -3.7 13/S-126 7850 6800 10.000 9.880 0.000 9.880 -1.2 14/S-126 7850 6800 10.000 9.750 0.000 9.750 -2.5 15/S-123 7850 6800 9.880 9.310 0.000 9.310 -5.8 16/S-117 7850 6800 9.380 10.000 0.000 10.000 6.6 17/S-111 7850 6800 8.880 8.500 0.000 8.500 -4.2 Review is only for conformance with design concept of this project and compliance with the intent of the contract documents. No exceptions observed by: Kirk See Make corrections observed by: Kirk See the equivalent decimal fraction. Page 1 of 3  Professional Service Industries, Inc. 4087 Shilling Way Dallas, TX 75237 Texas Firm Registration No. F-03307 Phone: (214) 330-9211 Fax: (214) 333-2853 Report No: PST:0341284-49/1 Post Tension Report Issue No:1  CARY SCHMOLDT, Client: CC: These test results apply only to the specific locations and materials noted and SCHMOLDT CONSTRUCTION may not represent any other locations or elevations. This report may not be CHRIS HOUSE, 5797 CR 126, SUITE A reproduced, except in full, without written permission by Professional Service GEORGE MARSHAL, Industries, Inc. HILLARY WHITE, CELINA, 75009  JOHN ELIAS, JOHN FIELDER, LARRY Project: COPPELL TENNIS CENTER DAVIS, LEE STONE,  Approved Signatory: Ronald Yeoman (Project Manager) COPPELL TX LOUIE LAUCK, Date of Issue: 1/7/2011 Date: Technician: 1/4/2011 Kirk See Location: Floor: Practice Court Pour: Serial No. of Gauge: Serial No. of Ram: 313993 022101 Strand Heat No: Strand MFG.: Contractor: Approved Drawings : (Strand Placement Shop Drawings) Stressed By: Verified By: Kirk See GAUGE PRESSURE MEASURED ELONGATION TENDON CALC % NO. ELONG JACKING LIFT OFF END 1 END 2 TOTAL 18/S-104 7850 8.380 8.250 0.000 8.250 -1.6 19/S-55 7850 4.380 3.940 0.190 4.130 -5.7 20/S-47 7850 3.750 4.000 0.000 4.000 6.7 21/S40 7850 7000 3.250 3.000 0.130 3.130 -3.7 22/S-62 7850 5.000 4.880 0.000 4.880 -2.4 23/S-62 7850 5.000 4.940 0.000 4.940 -1.2 24/S-62 7850 5.000 4.880 0.000 4.880 -2.4 25/S-62 7850 5.000 4.940 0.000 4.940 -1.2 ¬¨ :¨¬ 7850 5.000 4.880 0.000 4.880 -2.4 27/S-62 7850 5.000 4.750 0.000 4.750 -5.0 28/S-62 7850 5.000 4.630 0.000 4.630 -6.2 29/S-62 7850 5.000 4.630 0.000 4.630 -3.8 30/S-62 7850 5.000 4.750 0.000 4.750 -5.0 31/S-62 7850 5.000 4.750 0.000 4.750 -5.0 32/S-62 7850 5.000 4.880 0.000 4.880 -2.4 33/S-62 7850 5.000 4.750 0.000 4.750 -5.0 34/S-62 7850 5.000 4.880 0.000 4.880 -2.4 Review is only for conformance with design concept of this project and compliance with the intent of the contract documents. No exceptions observed by: Kirk See Make corrections observed by: Kirk See Page 2 of 3  Professional Service Industries, Inc. 4087 Shilling Way Dallas, TX 75237 Texas Firm Registration No. F-03307 Phone: (214) 330-9211 Fax: (214) 333-2853 Report No: PST:0341284-49/1 Post Tension Report Issue No:1  CARY SCHMOLDT, Client: CC: These test results apply only to the specific locations and materials noted and SCHMOLDT CONSTRUCTION may not represent any other locations or elevations. This report may not be CHRIS HOUSE, 5797 CR 126, SUITE A reproduced, except in full, without written permission by Professional Service GEORGE MARSHAL, Industries, Inc. HILLARY WHITE, CELINA, 75009  JOHN ELIAS, JOHN FIELDER, LARRY Project: COPPELL TENNIS CENTER DAVIS, LEE STONE,  Approved Signatory: Ronald Yeoman (Project Manager) COPPELL TX LOUIE LAUCK, Date of Issue: 1/7/2011 Date: Technician: 1/4/2011 Kirk See Location: Floor: Practice Court Pour: Serial No. of Gauge: Serial No. of Ram: 313993 022101 Strand Heat No: Strand MFG.: Contractor: Approved Drawings : (Strand Placement Shop Drawings) Stressed By: Verified By: GAUGE PRESSURE MEASURED ELONGATION TENDON CALC % NO. ELONG JACKING LIFT OFF END 1 END 2 TOTAL 35/S-62 7850 6900 5.000 4.630 0.060 4.690 -6.2 36/S-62 7850 5.000 4.880 4.880 -2.4 37/S-62 7850 5.000 4.690 4.690 -6.2 38/S-62 7850 5.000 4.690 4.690 -6.2 39/S-62 7850 5.000 4.690 4.690 -6.2 40/S-62 7850 5.000 4.880 4.880 -2.4 41/S-62 7850 5.000 4.880 4.880 -2.4 42/S-62 7850 5.000 4.880 4.880 -2.4 43/S-62 7850 5.000 4.880 4.880 -2.4 44/S-62 7850 5.000 4.940 4.960 -1.2 45/S-62 7850 5.000 4.940 4.940 -1.2 46/S-62 7850 5.000 5.000 5.000 0 47/S-62 7850 5.000 5.250 5.250 5 48/S-54 7850 4.380 4.130 4.130 -5.7 49/S-46 7850 3.750 3.380 0.25 3.630 -3.2 50/S-40 7850 3.250 3.250 3.250 0 Review is only for conformance with design concept of this project and compliance with the intent of the contract documents. No exceptions observed by: Make corrections observed by: Remarks: Cablesused numbering starting at NW Corner and went South with cables running East to West. Then SW Corner North to South Cables on that corner to SE Corner. Page 3 of 3  Professional Service Industries, Inc. 4087 Shilling Way Dallas, TX 75237 Texas Firm Registration No. F-03307 Phone: (214) 330-9211 Fax: (214) 333-2853 Report No: SDFR:0341284-48/1 Summary Daily Field Report Issue: 1  CARY SCHMOLDT, Client: CC: These test results apply only to the specific locations and materials noted and SCHMOLDT CONSTRUCTION may not represent any other locations or elevations. This report may not be CHRIS HOUSE, 5797 CR 126, SUITE A reproduced, except in full, without written permission by Professional Service GEORGE MARSHAL, Industries, Inc. HILLARY WHITE, CELINA, 75009  JOHN ELIAS, JOHN FIELDER, LARRY Project: COPPELL TENNIS CENTER DAVIS  Approved Signatory: Ronald Yeoman (Project Manager) COPPELL TX Date of Issue: 1/7/2011  Date: 1/3/2011 WEATHER: PARTIAL CLOUDY TEMPERATURE RANGE: TO 65 75 PSI REPRESENTATIVE: KIRK SEE TYPE OF INSPECTION BEING PERFORMED SOILS CONCRETE FOUNDATIONS BATCH PLANT CONTROLLED FILL (COMPACTION) PLACEMENT (JOB SITE) ASPHALT OTHER BATCH PLANT INSULATION INSPECTION PLACEMENT (JOB SITE) BRIEF RESUME OF WORK ACCOMPLISHED THIS DATE: On this date, a PSI representative traveled to the referenced project to inspect insulation in the existing hallways leading to showers and in the showers. Existing hall ceiling had Certian Tend R22 -Z1 @ 5 and R-30 in the ceiling. Page 1 of 1