Loading...
ST0301A-CS100819 (1/12/2011) Keith Marvin - RE: Bethel Rd - North side rip rapPage 1 From: "Dean Dumke" <deand@JRJPaving.com> To: "Coppell Keith Marvin" <KMARVIN@coppelltx.gov>, <deand@JRJPaving.com> Date: 8/19/2010 7:00 AM Subject: RE: Bethel Rd - North side rip rap Meeting n tx contracting at penfolds at same time, so I will see you around then too. Sent from my HTC Touch Pro2 on the Now Network from Sprint®. -----Original Message----- From: Keith Marvin <KMARVIN@coppelltx.gov> Sent: Thursday, August 19, 2010 5:43 AM To: deand@JRJPaving.com <deand@JRJPaving.com> Subject: Re: Bethel Rd - North side rip rap I'll stop on my way to the office at about 7:30. -----Original Message----- From: "Dean Dumke" <deand@JRJPaving.com> To: Keith Marvin <KMARVIN@coppelltx.gov> To: Caleb Thornhill <bct@freese.com> Cc: Marty Murphy <Martym@JRJPaving.com> Sent: 8/18/2010 5:37:54 PM Subject: Bethel Rd - North side rip rap Keith, I need to see if we can meet on site 1st thing in the morning regarding the north side rip rap that was added to the plans. Currently we are making necessary cuts per the grades, but if we do so the screening wall at the NE corner of the bridge will probably be coming down to the bottom of the creek. I am trying to get this resolved 1st thing tomorrow due to the beams are coming in on Friday and will not be able to have any equipment in this area or be able to excavate this out with my equipment. Please let me know if you could swing by in the morning so I could show you this problem. Thank you, Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________ (1/12/2011) Keith Marvin - RE: Bethel Rd - North side rip rapPage 2