Loading...
ST0301A-CS100820 (2) (8/9/2011) Keith Marvin - Re: Bethel Rd Phase IIPage 1 From: Keith Marvin To:Obarr, Mark CC:Birdsall, Per Date: 8/20/2010 5:11 PM Subject: Re: Bethel Rd Phase II Attachments:ed1-03.pdf Coordinate with Oncor for service drop location, then provide metered service per the Txdot details attached, type SF(U). Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Mark Obarr <mark@melselectric.com> 8/20/2010 4:49 PM >>> There are no service details in the plans. How so you want to handle that? Mark O'Barr Sent from my IPhone. On Aug 20, 2010, at 4:29 PM, Keith Marvin <kmarvin@coppelltx.gov> wrote: > They will be metered lights. JRJ/Mels will need to install the service. > > > > Keith Marvin, P.E. > Project Engineer > (972) 304-3681 > > > >>>> Per Birdsall 8/20/2010 4:07 PM >>> > Are these going to be Oncors or ours? Probably ours because of the mountings. Per > >>>> Mark Obarr <mark@melselectric.com> 8/20/2010 2:04 PM >>> > > Per, > > We are going to be installing some lights on the new bridge. The plans do not show a power source for them. Do you know if we are to install a service or are the lights going to be fed with no meter? > > > Mark O'Barr > Mels Electric L.P. > Voice (972) 441-6208 > Fax (972) 441-6394 > 6305 S. IH 45 > PO Box 40 > Wilmer, TX 75172 > > (1/13/2011) Keith Marvin - Re: Bethel Rd Phase IIPage 1 From: Mark Obarr <mark@melselectric.com> To: "Keith Marvin" <kmarvin@coppelltx.gov> CC: "Per Birdsall" <PBIRDSALL@coppelltx.gov> Date: 8/20/2010 4:50 PM Subject: Re: Bethel Rd Phase II There are no service details in the plans. How so you want to handle that? Mark O'Barr Sent from my IPhone. On Aug 20, 2010, at 4:29 PM, Keith Marvin <kmarvin@coppelltx.gov> wrote: > They will be metered lights. JRJ/Mels will need to install the service. > > > > Keith Marvin, P.E. > Project Engineer > (972) 304-3681 > > > >>>> Per Birdsall 8/20/2010 4:07 PM >>> > Are these going to be Oncors or ours? Probably ours because of the mountings. Per > >>>> Mark Obarr <mark@melselectric.com> 8/20/2010 2:04 PM >>> > > Per, > > We are going to be installing some lights on the new bridge. The plans do not show a power source for them. Do you know if we are to install a service or are the lights going to be fed with no meter? > > > Mark O'Barr > Mels Electric L.P. > Voice (972) 441-6208 > Fax (972) 441-6394 > 6305 S. IH 45 > PO Box 40 > Wilmer, TX 75172 > >