ST0301A-CS100824Page 1 of 2
Keith Marvin - FW: Bethel Road Reconstruction - North Retaining Wall ROW conflict
From:
"Dean Dumke" <deand(�JRJPaving.com>
To:
"Keith Marvin" <kmarvin(�'.&oppelltx.gov>
Date:
8/24/2010 7:50 PM
Subject:
FW: Bethel Road Reconstruction - North Retaining Wall ROW conflict
CC:
"Marty Murphy" <MartymgJRJPaving.com >, "Kim Entrekin"
<KimegJRJPaving.com >, "Butch Cross" <butchcgJRJPaving.com>
Attachments:
20100823143532.pdf; CO11R Remove N Wall Footing.pdf
Keith,
Attached is the revised number for Option #2 listed below. The cost associated with Option #1 is going to be
around $22k to perform the work requested. I am not going to generate a change order of Option #1 due to the
amount of cost and time to generate something that will not be an option any way.
Thank you,
Dean Dumke
Sr Project Manager
#469 - 223 -7879
J RJ PAVING, L. P.
From: Caleb Thornhill [ma i Ito: bct@freese.com]
Sent: Monday, August 23, 2010 4:55 PM
To: Dean Dumke; Keith Marvin
Cc: Ken Griffin; Tricia Hatley; Chris Poteet; CPL03243; Peter Kau
Subject: FW: Bethel Road Reconstruction - North Retaining Wall ROW conflict
Dean /Keith,
Listed below are two different options we need JRJ's estimated construction cost to eliminate the north
retaining wall ROW conflict:
1. Modify poured footing —
a. Modify poured footing from STA 37 +07.87 to STA 37 +62, approximately 56 LF. We'll remove 2'
of existing footing from face of wall and add an additional 3' of footing to back of wall per
attached detail. Alignment of wall will remain the same.
2. Remove and replace footing of retaining wall —
a. Remove and replace poured footing from STA 37 +07.87 to STA 37 +70, approximately 62 LF.
Wall and footing will need to be removed and realigned to avoid ROW conflict. Wall will remain
TxDOT standard RW 1(H)C.
Dean, please contact me if you have any questions regarding this estimate.
B. Caleb Thornhill P.E.
file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4C742268City_o... 1/13/2011
Page 2 of 2
Project Manager
Freese and Nichols, Inc.
w Main - 214- 217 -2200
s Direct - 214- 217 -2282
s Fax 214- 920 -2565
® Email: bct _,freese.com
Please consider the environment before printing this message.
This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment,
may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential
and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention,
copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or
entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and
delete all copies of the material from any computer. Thank you for your cooperation.
file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4C742268City_o... 1/13/2011
JRJ PAVING, L.P.
Proposed Change Order IIR
DATE: 8/24/2010
TO: City of CoppelI PROPOSAL FOR : Bethel Rd II
ATTN: Keith Marvin
Item Description Unit Quantity Unit Price
1 Remove Concrete Footing Installed (62' of Wall at 7' Average) SF 434 $20.40
2 Excavate & Remove Concrete Footing (62' of Wall at T average) Day 1 $1,860.00
3 Haul Concrete to Big City LD 4 $180.00
4 Cost for Reinforcing Wall Steel (On Site and not Used) LBS 2142 $0.78
Total if wall not rebuilt, Items 1 -4
Total if wall is rebuilt in new location, Items 1 -3, with item 206 on contract used to build back wall
Item 1 listed pricing is 50% of unit price of contract item 206.
Item 4 will be deleted if the the wall is reinstalled
Should you have any questions or require additional information please feel free to call me.
Respectfully Submitted,
Total Amount
$8,853.60
$1,860.00
$720.00
$1,670.76
$13,104.36
$11,433.60
Dean Dumke
Sr Project Manager
SAW CUT LINE
i
N
Irl-
• 1 I • • O
2'
EXISTING
FOOTING TO
BE REMOVED)
9 ») cv
# BARS @ 12 "C /C
- #5 BAR @ 6 "C /C
(DOWEL 1' -3" INTO
EXISTING FOOTING)
3'
(NEW FOOTING)
SECTION A -A
NOT TO SCALE