Loading...
ST0301A-CS100824Page 1 of 2 Keith Marvin - FW: Bethel Road Reconstruction - North Retaining Wall ROW conflict From: "Dean Dumke" <deand(�JRJPaving.com> To: "Keith Marvin" <kmarvin(�'.&oppelltx.gov> Date: 8/24/2010 7:50 PM Subject: FW: Bethel Road Reconstruction - North Retaining Wall ROW conflict CC: "Marty Murphy" <MartymgJRJPaving.com >, "Kim Entrekin" <KimegJRJPaving.com >, "Butch Cross" <butchcgJRJPaving.com> Attachments: 20100823143532.pdf; CO11R Remove N Wall Footing.pdf Keith, Attached is the revised number for Option #2 listed below. The cost associated with Option #1 is going to be around $22k to perform the work requested. I am not going to generate a change order of Option #1 due to the amount of cost and time to generate something that will not be an option any way. Thank you, Dean Dumke Sr Project Manager #469 - 223 -7879 J RJ PAVING, L. P. From: Caleb Thornhill [ma i Ito: bct@freese.com] Sent: Monday, August 23, 2010 4:55 PM To: Dean Dumke; Keith Marvin Cc: Ken Griffin; Tricia Hatley; Chris Poteet; CPL03243; Peter Kau Subject: FW: Bethel Road Reconstruction - North Retaining Wall ROW conflict Dean /Keith, Listed below are two different options we need JRJ's estimated construction cost to eliminate the north retaining wall ROW conflict: 1. Modify poured footing — a. Modify poured footing from STA 37 +07.87 to STA 37 +62, approximately 56 LF. We'll remove 2' of existing footing from face of wall and add an additional 3' of footing to back of wall per attached detail. Alignment of wall will remain the same. 2. Remove and replace footing of retaining wall — a. Remove and replace poured footing from STA 37 +07.87 to STA 37 +70, approximately 62 LF. Wall and footing will need to be removed and realigned to avoid ROW conflict. Wall will remain TxDOT standard RW 1(H)C. Dean, please contact me if you have any questions regarding this estimate. B. Caleb Thornhill P.E. file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4C742268City_o... 1/13/2011 Page 2 of 2 Project Manager Freese and Nichols, Inc. w Main - 214- 217 -2200 s Direct - 214- 217 -2282 s Fax 214- 920 -2565 ® Email: bct _,freese.com Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4C742268City_o... 1/13/2011 JRJ PAVING, L.P. Proposed Change Order IIR DATE: 8/24/2010 TO: City of CoppelI PROPOSAL FOR : Bethel Rd II ATTN: Keith Marvin Item Description Unit Quantity Unit Price 1 Remove Concrete Footing Installed (62' of Wall at 7' Average) SF 434 $20.40 2 Excavate & Remove Concrete Footing (62' of Wall at T average) Day 1 $1,860.00 3 Haul Concrete to Big City LD 4 $180.00 4 Cost for Reinforcing Wall Steel (On Site and not Used) LBS 2142 $0.78 Total if wall not rebuilt, Items 1 -4 Total if wall is rebuilt in new location, Items 1 -3, with item 206 on contract used to build back wall Item 1 listed pricing is 50% of unit price of contract item 206. Item 4 will be deleted if the the wall is reinstalled Should you have any questions or require additional information please feel free to call me. Respectfully Submitted, Total Amount $8,853.60 $1,860.00 $720.00 $1,670.76 $13,104.36 $11,433.60 Dean Dumke Sr Project Manager SAW CUT LINE i N Irl- • 1 I • • O 2' EXISTING FOOTING TO BE REMOVED) 9 ») cv # BARS @ 12 "C /C - #5 BAR @ 6 "C /C (DOWEL 1' -3" INTO EXISTING FOOTING) 3' (NEW FOOTING) SECTION A -A NOT TO SCALE