Loading...
ST0301A-CS1008252011) Keith Marvin - RE: Bethel Rd -Wall Modification Page 1 From: Caleb Thornhill <bct @freese.com> To: Keith Marvin <kmarvin @coppelltx.gov >, Dean Dumke <deand @JRJ Paving. com> CC: Chris Poteet <cjp @freese.com >, Tricia Hatley <thh @freese.com >, Peter Kau... Date: 8/25/2010 6:47 PM Subject: RE: Bethel Rd - Wall Modification Attachments: proposed screen wall. pdf; retrofit existing footing. pdf Keith /Dean, Here are some options to start working on. We will need feedback from JRJ and their bridge sub contractor tomorrow. Dean, The "proposed screenwall" is for the first 55ft of the north wall. We need you guys to put together a cost associated with this option. The "retrofit existing footing" is a couple of options on of how to construct the remaining north and south wall using the existing footing and wall already on the ground. Please pass this on to your bridge sub contractor and have him provide feedback tomorrow. Dean, have Steve contact Peter with any questions he might have about these details. If he would like to come by our office tomorrow, just let me know. Obviously, there are still details to be completed with both of these, so immediate feedback is essential in order to prevent any more delays. If these options seem feasible, we can provide Peter a clear direction to expedite the completion of the details. Keith, I have our stormwater guys reviewing the riprap limits on the north /east side of the bridge. I will have something for you by Friday on this. We will provide comments on the CTB tomorrow. Can you verify with Larry that CTB has already been placed in the bridge structure? Call me with any questions you might have Caleb From: Keith Marvin [kmarvin @coppelltx.gov] Sent: Wednesday, August 25, 2010 5:12 PM To: Caleb Thornhill; Dean Dumke Cc: Chris Poteet; Tricia Hatley Subject: RE: Bethel Rd - Wall Modification The sooner we determine our course of action, the better Keith >>> Caleb Thornhill <bct @freese.com> 8/25/2010 2:41 PM >>> Keith, We'll look at this and try and determine the feasibility. I will try and have something back to you by Friday. B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214 - 217 -2282 9 1 I I I I I I I I I I I I I FRONT FACE OF WALL I I I i i I i I I I I I I I I I I --------- - - - --I i I I I I I A I I I I I I I I I I WALL STEM TO BE BUILT I I I I I I I I I I i I I I I I I I I I I I i EXISTING FOOTING I I ----------- - - - - -- ---- - - - - -- I I I I I i r - - - --I I NOTE: 1. THIS SECTION IS FOR SCREEN WALL PRICING ONLY. 2. ANY AESTHETIC DETAIL REQUIRED IS NOT PRESENTED IN THIS SKETCH. 3. REINFORCING NOT SHOWN. PROPOSED SCREEN WALL -I- NOT TO SCALE k/j C ( k M m '1 09 419 C N,O k+j 2011) Keith Marvin - RE: Bethel Rd -Wall Modification Page 2 - - - -- Original Message---- - From: Dean Dumke [mailto:deand @JRJPaving.com] Sent: Wednesday, August 25, 2010 2:32 PM To: Keith Marvin; Caleb Thornhill Subject: Bethel Rd - Wall Modification Keith, Attached is what Steve Goodman is suggesting be done to correct the situation that was discussed on site yesterday. The 2'x2' concrete block is to be installed on the Roadway Side of the wall. The steel needed in this area is to be determined by the Structural Engineer and will be installed, per their recommendation. would also like to know the distance of the #5 bars that will need to be added in the wall areas greater than 6' in height. As of yesterday, we have ceased all wall pours on the north and south sides until this is resolved. Anything that can be done to help in proceeding forward will be appreciated. Thank you, Dean Dumke Sr Project Manager #469- 223 -7879 J RJ PAVING, L. P. Please consider the environment before printing this message This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. 2011) Keith Marvin - FW: Bethel Rd -Wall Modification Page 1 From: "Dean Dumke" <deand @JRJ Paving .com> To: "Keith Marvin" <kmarvin @coppelltx.gov> Date: 8/25/2010 4:03 PM Subject: FW: Bethel Rd - Wall Modification Keith, Whatever you can do to help this along to get sooner, will be appreciated. Also, thank you for your input at the meeting yesterday at the afternoon meeting as to what has transpired up to this point regarding the walls and their inspection. Thank you, Dean Dumke Sr Project Manager #469- 223 -7879 J RJ PAVING, L. P. - - - -- Original Message---- - From: Caleb Thornhill [mailto:bct @freese.com] Sent: Wednesday, August 25, 2010 2:42 PM To: Dean Dumke; Keith Marvin Subject: RE: Bethel Rd - Wall Modification Keith, We'll look at this and try and determine the feasibility. I will try and have something back to you by Friday. B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214 - 217 -2282 - - - -- Original Message---- - From: Dean Dumke [mailto:deand @JRJPaving.com] Sent: Wednesday, August 25, 2010 2:32 PM To: Keith Marvin; Caleb Thornhill Subject: Bethel Rd - Wall Modification Keith, Attached is what Steve Goodman is suggesting be done to correct the situation that was discussed on site yesterday. The 2'x2' concrete block is to be installed on the Roadway Side of the wall. The steel needed in this area is to be determined by the Structural Engineer and will be installed, per their recommendation. would also like to know the distance of the #5 bars that will need to be added in the wall areas greater than 6' in height. As of yesterday, we have ceased all wall pours on the north and south 2011) Keith Marvin - FW: Bethel Rd -Wall Modification Page 2 sides until this is resolved. Anything that can be done to help in proceeding forward will be appreciated. Thank you, Dean Dumke Sr Project Manager #469- 223 -7879 J RJ PAVING, L. P. Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. 08/21/2010 00:43 9729244713 N PAGE 01/02 NORTH TEXAS BRIDGE CO-9 C IN . Mail to: P. 0 . Box 865149, p TX Admn /J:ngr: 972 -924 -3557 FAX: 972-924-4713 ber AGC of Texas An equal opportunity employer Mem_ M Paving LP 1805 Royal Lane Dallas, Texas 75229 Attn: Dean. Dumke Project Manager Re: Bethel Road Coppell, Texas Wall Modification August 25, 2010 2144668354 Dean, The sketch below modifies the MOT STD wall detail, adding weight to the roadway side. This will counter the motnex. tat the joint, with the steel being placed with the face of the wall to the .roadway side as staked. by your surveyor. This work can be done immediately and not cause any significant delay. Please have the engineers review and respond. You ly, Step en P Goodman. President cli Is) CD Ld (D <1 n - f— I. o f [cll- S[c a- Gf rw H DEFINITION REINFORCING STEEL FOR ONE 32' PANEL (DESIGN Al PROPERTIES .. . . ... ... 01- Vax J-5 12 C .1 k, is .1i LZ - 25 Z= .2 1 :1 : i ' I �f is, ! -F, �� WALL MWASM.: i i I 1' -2' 4IS 12] -2 It �2• 7-13 IS.-Y 26 -2 2T 9- ;;- 34 13 ma _2 Ea 2D'-Vil 49 2.26 sl-r 5.. U 12' Mn Ij -_r a g 22'-0* 1 2.43 IY-3* 5 -0 2 z y 3 I• -Z* 419- T2 L . f 2 3 8 15•x - 2 , 2' 2. 40 1 SL 2 . E221 L. 1 3 . � :2' 1 ffM 5z i 1 2. 3 -3 Z IT . LIM W-2• L9t h u 2D' I ITX, L Q-. • I 1 BARS As F C cn C'4 F_ M I 04 —4 i CA co M "I BARS A2 T. . S. E 1 `• T- - , S� - 216_6' it 4'(LA' BARS At vartlMl WS try p � ­ift .. 12' , ; o s - q>pl— f—im ice *;Y, 2: V. 4 Rik f.r 0— R oil I - V PA 0 .1 12- fat Jaint % u eb Ss -S. H 1 14' I H SECTIONS : ;r L r 8 : 2 ? IA IF— LE4V" rtirer 6' BARS 1), H, T r_i� BARS F C�) L wI lai H - 12' IN • 14 _� 1 Mifem In t 4 fWC) 32 _� ,It 2 1 12. -all BARS A6 A li, 2_5 - a , - BARS A" c 5 61HER111. NOT BARS 6 BARS u r — nad �_i M .- "Irr. LL -26 Inv.. .10h MPurf- Or Tr-g*d a-up, tootn RETAINING WALLS RW I MA H r 20. it • 23 1 • 26' 11 • 39 AI WAI I Pi rVAT IONS H 1 14' I H SECTIONS : ;r L r 8 : 2 ? IA IF— LE4V" rtirer 6' BARS 1), H, T r_i� BARS F C�) L wI lai H - 12' IN • 14 _� 1 Mifem In t 4 fWC) 32 _� ,It 2 1 12. -all BARS A6 A li, 2_5 - a , - BARS A" c 5 61HER111. NOT BARS 6 BARS u r — nad �_i M .- "Irr. LL -26 Inv.. .10h MPurf- Or Tr-g*d a-up, tootn RETAINING WALLS RW I MA H r 20. it • 23 1 • 26' 11 • 39 AI WAI I Pi rVAT IONS