Loading...
ST8804-CS 910211February 11, 1991 '~---~ ~ Mr. William A. Anderson, P.E. Dan M. Dowdey & Associates 16250 Dallas Parkway, Suite 100 Dallas, Texas 75248 RE: Utility Construction - Heartz Road; Coppell, Texas Dear Mr. Anderson: Your letter dated 2/4/91 along with the letter from Geo-Technique, Inc. dated 2/1/91 regarding density requirements for backfill for underground installation of utilities has been received. Staff has reviewed your comments and those of Mr. Louis L. Hargis, P.E. of Geo-Technique, Inc. related to the N.C.T.C.O.G. specifications 6.2.9 "backfill" for underground conduit construction and related standards. We recommend that all requirements set forth in the City of Coppell Subdivision Ordinance - Appendix A, Page 29, Section 9 be complied with (see attached) as well as all related items. The inquiry related to the possibility of the compaction equipment being used, damaging the installed underground conduit, staff recommends the use of the proper compaction equipment designed for the specific task and reasonable care be taken not to cause damage to the installed conduit. (Page 1) The field compaction report dated 1/29/91 from Gee-Technique, Inc. on Line A Storm Sewer indicates an unacceptable percentage of compaction and should be corrected to specification requirements. If I can be of further assistance, please let me know. Larry~DavO~ Construction Inspector CLD/sm cc:~Shohre Daneshmand, Acting City Engineer Louis L. Hargis, P.E., Gee-Technique, Inc. Rey Gonzales, Streets Superintendent Howard Pafford, Water Superintendent Ben Dela Cruz, Engineer Technician File (Page 2)