Loading...
ST0301A-CS100908 (1/25/2011) Keith Marvin - RE: Bethel Road - Pay Application #3Page 1 From: Caleb Thornhill <bct@freese.com> To: Keith Marvin <kmarvin@coppelltx.gov> CC: CPL03243 <CPL03243@freese.com> Date: 9/8/2010 3:47 PM Subject: RE: Bethel Road - Pay Application #3 Keith, Here are the numbers I get for concrete removal: Driveway STA 35+72 - 80 SY Penfolds STA 37+10 - 336 SY Armstrong (2 Dwys) STA 46+52 & STA 47+35 - 217 SY Knights Way STA 48+19 - 187 SY Chateaus STA 50+53 - 396 SY Denton Tap Intersection - 741 SY Total = 1957 SY The Berkbile drive I was unsure about due to their construction schedule, but assuming we remove to his property limit its around 90 SY. City's concrete cap adds 573 SY. Total + Berkbile (90) + City (573)= 2620 SY This is the revised number I sent to you after the bid (2047 SY), minus the concrete cap. This is still well short than the 3826 SY shown on the Pay Req #3. Other than some minor sidewalk (maybe 30-50 SY) removal near the Chateaus, is there a significant concrete removal that we've missed or that was added that I'm unaware of? B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214-217-2282 -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Wednesday, September 08, 2010 11:37 AM To: Caleb Thornhill Subject: RE: Bethel Road - Pay Application #3 Caleb, I need you to review the quantity of concrete removal. There is a concrete cap that they are removing from over the sewer line, but that only accounts for 573 square yards. At one time you sent a revised spreadsheet showing 2047 SY of concrete removal, but that is still more than 1,000 yards below their number. We are dealing with #120 and #121. #203 is for the value of the material on hand. We are still considering the merits of #206. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 (1/25/2011) Keith Marvin - RE: Bethel Road - Pay Application #3Page 2 >>> Caleb Thornhill <bct@freese.com> 9/8/2010 11:13 AM >>> Keith, Item #109 - Overage by 2414 SY Item #120 - Overage by 1547 SY Item #121 - Overage by 162 SY Are these confirmed overages? Item #203 - Attached (Larwel Industries) says 85.45 LF, Pay App shows 35.33 LF? Item #206 - Is there an agreement in place for the removal/installation of the new wall? These are the only things I noticed. Call me if you have any questions or would like to discuss. B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214-217-2282 -----Original Message----- From: Dean Dumke [mailto:deand@JRJPaving.com] Sent: Wednesday, September 08, 2010 9:21 AM To: Keith Marvin Cc: Caleb Thornhill Subject: Bethel Road - Pay Application #3 Keith, Attached is the pay application for August. Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________ -----Original Message----- From: Ruscella Blease Sent: Wednesday, September 08, 2010 9:04 AM To: Dean Dumke Subject: Bethel Road Pay Application #3 Ruscella Blease JRJ Paving, LP 1805 Royal Lane, Suite 107 Dallas, TX 75229 214-751-3847 or 214-466-8340 Fax: 214-466-8353 (1/25/2011) Keith Marvin - RE: Bethel Road - Pay Application #3Page 3 Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. (1/13/2011) Keith Marvin - RE: Paving areas Sta 4750 to 5050Page 1 From: "Dean Dumke" <deand@JRJPaving.com> To: "Scott Latta" <slatta@coppelltx.gov> CC: "Keith Marvin" <KMARVIN@coppelltx.gov>, "Larry Davis" <LDAVIS@coppelltx.... Date: 9/8/2010 9:11 AM Subject: RE: Paving areas Sta 4750 to 5050 Keith, I am heading to your office to discuss this. This is incorrect information. Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________ -----Original Message----- From: Scott Latta [mailto:slatta@coppelltx.gov] Sent: Wednesday, September 08, 2010 9:09 AM To: Dean Dumke Cc: Keith Marvin; Larry Davis Subject: RE: Paving areas Sta 4750 to 5050 Dean, The areas on the intersection map were derived from GPS points gathered at the location, without regard for pavement thickness or subgrade prep. The thickness shown is at the direction of Larry and Keith, and will be changed when directed by them. I will modify the pavement area table to better show how the net areas were calculated. Thanks, Scott Latta Engineering Technician City of Coppell, Texas 255 Parkway Blvd. Coppell, Texas 75019 Office Phone: (972) 304-3683 Fax: (972) 304-3570 e-mail: slatta@coppelltx.gov >>> "Dean Dumke" <deand@JRJPaving.com> 9/8/2010 8:56 AM >>> Scott, The information you sent on the intersection is incorrect. The whole intersection was poured with 10" concrete, not just Denton Tap. It was a remove and reinstall, no lime. Larry is aware of this. Please have your drawing reflect this. Dean Dumke (1/13/2011) Keith Marvin - RE: Paving areas Sta 4750 to 5050Page 2 Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________ -----Original Message----- From: Scott Latta [mailto:slatta@coppelltx.gov] Sent: Wednesday, September 08, 2010 8:15 AM To: Dean Dumke Subject: RE: Paving areas Sta 4750 to 5050 Sure, they are attached. I have been asked to separate the median nose areas from the paving areas; I hope to get to that today. I will forward to you when it is reviewed. Thanks, Scott Latta Engineering Technician City of Coppell, Texas 255 Parkway Blvd. Coppell, Texas 75019 Office Phone: (972) 304-3683 Fax: (972) 304-3570 e-mail: slatta@coppelltx.gov >>> "Dean Dumke" <deand@JRJPaving.com> 9/8/2010 8:04 AM >>> Scott, Can I get you to send me all of the ones you have done to date? I would like to be able to cross reference them with what I am showing in case there is a discrepancy. I spoke with Larry and he thought you were going to. Thanks, Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________ -----Original Message----- From: Scott Latta [mailto:slatta@coppelltx.gov] Sent: Tuesday, September 07, 2010 3:20 PM To: Dean Dumke Subject: Paving areas Sta 4750 to 5050 Attached. (1/13/2011) Keith Marvin - RE: Paving areas Sta 4750 to 5050Page 3 Thanks, Scott Latta Engineering Technician City of Coppell, Texas 255 Parkway Blvd. Coppell, Texas 75019 Office Phone: (972) 304-3683 Fax: (972) 304-3570 e-mail: slatta@coppelltx.gov