PROJECT: W. BETHEL ROAD
(Denton Tap to Penfolds Ln)
PROJECT NO. ST 03 -01, Phase II -A
OWNER: CITY of COPPELL EQUIPMENT AT THE SITE:
CONTRACTOR: JRJ PAVING, LP g - 5 / t
13 c_._
CONSTRUCTION ACTIVITIES: .
J yA-
i
WEATHER SUN C OV ERC AST RAIN SNOW we" `� 4 w r t.( o ak, �e » . 1 �eot S o .
h e t rP I tedJ 1 i fer rfdiN !/ a� ,
/ 9 1
TEMP To 32 32 -50 50 -70 70 -85 85 up
WIND SC Mod High Report No
HUMIDITY 7 Mod Humid
M T W T F S S
DATE
1/437/4/ ENGINEERING DEPT. INSPECTOR