ST0301A-CR101216 T H E •C I T Y •o F AVERAGE FIELD FORCE
C O P P E L L NAME OF CONTRACTOR NON- MANUAL REMARKS
JRJ PAVING, LP MANUAL
• * 4-
r a- - , -�= o VISITORS
x A S , a q
TIME REPRESENTATIVE REPRESENTING REMARKS
PROJECT: W. BETHEL ROAD
(Denton Tap to Penfolds Ln) —
PROJECT NO. ST 03 -01, Phase II -A
OWNER: CITY of COPPELL EQUIPMENT AT THE SITE:
CONTRACTOR: JRJ PAVING, LP pi 7 53 C. i > g 3
CONSTRUCTION ACTIVITIES:
WEATHER SUN CAST RAIN SNOW
! C/ LEAR OO Is �� � � c/ e i c 011 Poi/ - ist `,F
OVER [i
TEMP To 32 32.50 - 0 70-85 85 up ✓
WIND Still Mod High Report No
HUMIDITY Dry Mod amid
M T W T S S
DATE
1 • • ENGINEERING DEPT. INSPECTOR