Loading...
ST0301A-CR101216 T H E •C I T Y •o F AVERAGE FIELD FORCE C O P P E L L NAME OF CONTRACTOR NON- MANUAL REMARKS JRJ PAVING, LP MANUAL • * 4- r a- - , -�= o VISITORS x A S , a q TIME REPRESENTATIVE REPRESENTING REMARKS PROJECT: W. BETHEL ROAD (Denton Tap to Penfolds Ln) — PROJECT NO. ST 03 -01, Phase II -A OWNER: CITY of COPPELL EQUIPMENT AT THE SITE: CONTRACTOR: JRJ PAVING, LP pi 7 53 C. i > g 3 CONSTRUCTION ACTIVITIES: WEATHER SUN CAST RAIN SNOW ! C/ LEAR OO Is �� � � c/ e i c 011 Poi/ - ist `,F OVER [i TEMP To 32 32.50 - 0 70-85 85 up ✓ WIND Still Mod High Report No HUMIDITY Dry Mod amid M T W T S S DATE 1 • • ENGINEERING DEPT. INSPECTOR