WA9903-CS000207SHIMEK, JACOBS & FINKLEA, L.L.P.
CONSULTING ENGINEERS
8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204
ROSS L. JACOBS, P.E.
RONALD V. CONWAY, P.E.
JOHN W. BIRKHOFF, P.E.
JOE R. CARTER, P.E.
GARY C. HENDRICKS. P.E
I C. FINKLEA, P.E.
PAUL A. CARLINE, P.E.
MATT HICKEY, P.E.
February 7, 2000
Phone (214) 361-7900
Mr. Kenneth M. Griffin, P.E.
CiW of Coppell
Post Office Box 478
Coppell, Texas 75019
Re: Village Parkway Pump Station - Addition of Pump No. 4
TxU Transformer Replacement
Dear Mr. Griffin:
We are continuing to work with Texas Utilities to provide the necessary information they require in order to
replace the transformers at the Village Parkway Pump Station. Attached is a copy of the electronic mail file
we sent to Mr. Rick Fielding at TxU. This copy is provided for your information and files.
We are available to discuss this project further at your convenience.
Sincere
Enclosures
cc: Mr. Glen Hollowell, P.E.
j'~clerical\coppell\1999-153\letters\corres\k\txu.doc
Gary Hendricks
From:
Sent:
To:
Subject:
Jeff York
Thursday, February 03, 2000 11:22 AM
Gary Hendricks
FW: Coppell P,S. - Location and Load Information
..... Original Message---
From: William Goff [SMTP:billgoff@earthlink.net]
Sent: Thursday, February 03, 2000 9:06 AM
To: Rick Fielding
Cc: Gary Hendricks
Subject: Coppell P.S. - Location and Load Information
SJF: Please route email copy to Gary Hendricks
Rick Fielding, TXU
Per our discussion, I have provided four (4) MS Powerpoint files as
listed below for our use in assisting the project completion for the
upgrade to the (~ity of Coppell Village Parkway P.S.
1. Location map file: Iocation.ppt
2, Single line file: 1-1ine,ppt
3. 2nd single line file: 1-line-b.ppt
4. load summary file: load summary.ppt
You indicated in our discussion that you should be able to provide us
your requirements or changes (if any) by 5-6 working days from providing
the information.
We will follow-up with you by the end of next week.
Please call if you have any questions or if you need the data sent by
mail.
Thanks.
1-11ne-b.pl3t load summary.ppt 1-1lne.ppt
I
1
480V & 208V ONE LINE DIACRA_M '
ITEM
1
2
3
4
DESCRIPTION HP KVA C.B. AMPS
wp-1 water pump no. 1 450 401.08
wp-2 water pump no. 2' ....... 450 .............2~0~.08' .............................
wp-3 water pump no.3 450 40'COB
wp-4 water pump no.4 ........................:4'50" ............40T'.08""' ......................
5 xfmr
6 wp-5 water pump no.5
'/ wp-6 water pump no.6
8 ............................~]t'heater
9 el-4 exhaust fan no.4
10 dry type xfmr
.... 500..00' ..........
25"0""227772'
2'~72' ....
........................................................................... 8T6'5 ...................................30 ............................
3 2.96
Tf2TS0~,. .............. :
'fl ............ '(~51orine equipment skid ...............................................................;1'7729' .........."60 .............................
"f2 uh-1 unit heater no.1 ~ 10.'00~ 10
"'T3 uh-'2 unit heater no.2 ........................t"'TOTO0", .............................10
14 Uh-'3 unit heater no.3 i i0.00"4 ............. 10
' i'5 el-1 exhaust fan no. 1 2 ..... ~'
16 Ipa Itg phi 43.23 15'0
1 i ef-f-f-~ exhaust fan no.2 ~'2 1.97 "
"'~B ~fi3'~haust fan no.3 ......... 2 ......................'T797 ..................:: ...................................
"'f9 uh-4 unit heater no.4 10.00 10
20 uh-'5 unit heater no. 5 ....................."t'0T00 ...................10
21 uh-6 unit heater no.6 T~ 10
"22 ~c condensing unit =1'7729 '60'
23 a/c air conditioner unit 1/.29 60
24 ammonia equipment skid "T7.29 60
........ 25 ....lighting p~ifi~'l'i~i'"'f~ pump room additr6n ........................................q'7:29' ....................60 ........................
KVA Tota I for
KVA Total randormers
401.08 401.08
2~0'~1":08 ...............................: ............
40'~.08 40139'8
.......40~':'0'8 ...............................................40'C0'8'
'500.'O'G
227.72
2277~
...........................................................8;65 ....................................................................
2.96
.......... "~RF2.~
............................... ~'7':29 ....................................................: ..........................
"' 1.97
43.23
1.97
................... ;1:97 ............................................................
;[7729
1/729
17729
........ ;[7:29 ...............................................................
I otal kV,~ 2206.95 2216.80
i';::: 'T~tal'kVA'9'0% Load i-actor Tg'BG::2¢ ......... "19'9!{7f2
Note: Items 6 & 7 am low head pump ................ ,
used for low water winter requirements -- L-- I
typically. ' ~ l<e co~~ I' ra nsforme r S~'2000'E~/~
,IF-~
I ~
IF~
o Pt~-3/SO0 KClL,I2/O G,4"C
~ PI07-312,16 G.3'C
~ ~.14 G,2 t/2'c
~'-"11,
t/2'C
Pt w-312.~ Uto
I1'
VF*4
~.4
_4160V ONE LINE DIAGRAM