ST0301A-CR110111 T H E C T T Y O F AVERAGE FIELD FORCE
COPPELL NAME OF CONTRACTOR NON- MANUAL REMARKS
JRJ PAVING, LP MANUAL
1 — - ° VISITORS
x A S . a
TIME REPRESENTATIVE REPRESENTING REMARKS
PROJECT: W. BETHEL ROAD
(Denton Tap to Penfolds Ln) —
PROJECT NO. ST 03 -01, Phase II -A
OWNER: CITY of COPPELL EQUIPMENT AT THE SITE:
CONTRACTOR: JRI PAVING, LP
CONSTRUCTION ACTIVITIES:
WEATHER SUN CLEAR OVERCAST RAIN SNOW • • 1,(10,4 4 11;//
TEMP To 32 J2 -50 50 - 7 0 70 -85 85 up
WIND Still Mod High Report No
HUMHNTY Dry Mod Hiunid
M T W T F SS
DATE
/ /1/ e� ` / ENGINEERING DEPT. INSPECTOR