Loading...
ST0301A-CR110111 T H E C T T Y O F AVERAGE FIELD FORCE COPPELL NAME OF CONTRACTOR NON- MANUAL REMARKS JRJ PAVING, LP MANUAL 1 — - ° VISITORS x A S . a TIME REPRESENTATIVE REPRESENTING REMARKS PROJECT: W. BETHEL ROAD (Denton Tap to Penfolds Ln) — PROJECT NO. ST 03 -01, Phase II -A OWNER: CITY of COPPELL EQUIPMENT AT THE SITE: CONTRACTOR: JRI PAVING, LP CONSTRUCTION ACTIVITIES: WEATHER SUN CLEAR OVERCAST RAIN SNOW • • 1,(10,4 4 11;// TEMP To 32 J2 -50 50 - 7 0 70 -85 85 up WIND Still Mod High Report No HUMHNTY Dry Mod Hiunid M T W T F SS DATE / /1/ e� ` / ENGINEERING DEPT. INSPECTOR