Loading...
ST0301A-CN110110CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Bethel Road H (ST 03 -01A) CONTRACTOR: JRJ Paving, L.P. OWNER: City of Coppell CHANGE ORDER NO.: Four (4) DATE: January 10, 2011 Pagel of 2 1. Bank stabilization at northeast corner of bridge. This work is necessary to protect private infrastructure adjacent to our work. Gabion work is in lieu of concrete rip -rap as originally designed. 2. Cost to add one set of pedestrian push buttons and signals at Bethel & Denton Tap. 3. Cost reduction associated with city supplying new traffic signal controller cabinet. 4. Cost reduction associated with changing the type and location of guardrails. Item Description ADD: 1. Gabion bank stabilization 2. PED Signal Section 3. PED pushbutton & 2 EA sign assembly Total Additions: DEDUCT: 200. Reduction of rip -rap quantity in location of Gabion installation. 1. Cost reduction for city supplying controller cabinet 2. Cost reduction for Guardrail changes Total Deductions: Quantity Unit Unit Price Total 1 LS $43,065.00 $43,065.00 2 EA $585.00 $1,170.00 2 EA $130.00 $260.00 $44,495.00 42 CY $214.20 ($8,996.40) 1 LS $7,875.00 ($7,875.00) 1 LS $7,803.30 ($7,803.30) ($24,674.70) Net Change: $19,820.30 Previous contract amount Net increase m contract amount Change Order # 1 (8 -3 -2010) Net increase in contract amount Change Order #2 (8 -10 -2010 council approved) Net increase in contract amount Change Order #3 (10 -28 -2010) Net increase in contract amount Change Order #4 Revised contract amount Cumulative increase in TOTAL change order amount (Percentage) Net increase in contract time of completion Revised Contract time of c ompletion $1,969,019.50 $23,505.50 $98,431.33 $16,215.00 $19,820.30 $ 2,126,991.63 8.0% 0 270 Calendar Days The contractor hereby accepts this Contract adjustment as a fmal and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. by CK Engineer Date Agreed to &Contractor 'Date Z�� � �I� j) 2-tj�l , Accepted by Vity Date