Loading...
ST0301A-CS1008022011) Keith Marvin - RE: RE: Bethel Revised Sheets Page 1 From: Caleb Thornhill <bct @freese.com> To: Keith Marvin <kmarvin @coppelltx.gov> Date: 8/2/2010 3:40 PM Subject: RE: RE: Bethel Revised Sheets Attachments: Grading Sheet GR -1 revised 080210.pdf Keith, our big printer has been out today. I'll get the revised grading sheet over there first thing in the morning. didn't get the hydrant location. They had already put the equipment when we talked about the hydrant. The surveyor gave me an approximate STA/OFF for the hydrant location. Based on that information, it looks to be ok, but I would feel more comfortable if Scott Latta could get the exact location. I'll have the 8 full and 5 halves delivered tomorrow. Let me know if anything else comes up. B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214 - 217 -2282 - - - -- Original Message---- - From: Keith Marvin [mailto:kmarvin @coppelltx.gov] Sent: Thursday, July 29, 2010 3:02 PM To: Caleb Thornhill Subject: Fwd: RE: Bethel Revised Sheets Caleb, Did we ever issue the revised wall grades? Do you have the hydrant location he is asking about? Keith >>> "Dean Dumke" <deand @JRJ Paving. com> 7/29/2010 3:00 PM >>> Keith, Don't see the fire hydrant we shot in and gave to Caleb at the SE corner of Chateau /Bethel. Is the Fire Hydrant going to be okay or in the handicap ramp area? Just wanted to make sure everything was accounted for. Also, are the plans ready to be picked up on the North Wall? When we met on Friday the 17th, you told me that Caleb was suppose to bring these to your office on Monday the 19th, but said you would let me know for sure when you had them and stamped for approval to proceed with this location. If you have these, I will pick these up tomorrow morning also. Dean Dumke Sr Project Manager #469- 223 -7879 J RJ PAVING, L. P. 2011) Keith Marvin - RE: RE: Bethel Revised Sheets Page 2 - - - -- Original Message---- - From: Keith Marvin [mailto:kmarvin @coppelltx.gov] Sent: Thursday, July 29, 2010 2:48 PM To: Dean Dumke; Marty Murphy Cc: Caleb Thornhill Subject: Fwd: Bethel Revised Sheets Dean, Attached are the revised drawings for Bethel Road between Armstrong and Denton Tap. There has been an adjustment to the profile, and a change to the alignment of the south curb line. This will result in the need to import approximately 200 cubic yards of additional material. We have a contract pay item for import and compaction of fill. I believe we can handle this change through adjustment of contract quantities. The engineer will be delivering these plans to my office today for me to stamp and sign. Please have someone come by in the morning to pick them up. Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> Caleb Thornhill <bct @freese.com> 7/29/2010 8:12 AM >>> Keith, Here are the revised sheets. How many full size sheets do you want delivered? B. Caleb Thornhill P.E. Project Manager [cid:image001.jpg @01 CB2EF5.C62FFCD0] Freese and Nichols, Inc. <http: / /www.freese.com /> * Main: 214 - 217 -2200 * Direct: 214- 217 -2282 * Fax: 214 - 920 -2565 * Email: bct@freese. com < mai Ito bct@freese. com > This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities 2011) Keith Marvin - RE: RE: Bethel Revised Sheets Page 3 other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. i D 5 3 :n !9 � � M J N \¢ � N Y.r STA 37 +0787, 22.00'LT INSTALL (R2) TRANSITIOP s \ STA 36 +9537, 22.001T INSTALL TAS _ 1 - E E- l STA 37 +07.87, 22.00'LT BEGIN TY C411 RAIL BEGIN RETAINING WALL TOP OF WALL = 497.97 Q BOTTOM OF WALL= 49256 3 N= 7033556.09 J E= 2428861.41 l 1 I ti,l Y O O d H N W Z J 2 c Q G I I I I I I I g3 " I I STA 41 +9585, 20.65LT micrAli Inv) meeinnnAl- • LJy DCIf - IGL I Uf1U ■ STA 41 +98.40, 2200'RT STA 38+50, 22.001T I TOP OF WALL= 498.19 / ■I 3 PI RETAINING WALL E= 2429351.98 STA 39 +77.25, 31.75LT N / TOP OF WALL = 497.22 3 STA 39 +67, 22.00' LT INSTALL TAS / BOTTOM OF WALL = 490.00 0 INSTALL (TL2) TRANSITION * I s4 O N= 7033547.41 _ E- 242900585 �. STA 39+67, 2Z00'LT .� 9. + a END TY C411 RAIL _ sz -:' as END RETAINING WALL W 0 10' 20' 40' s mm TOP OF WALL = 496.63 q BOTTOM OF WALL= 494.63 = SCALE IN FEET s10 a - _�N= 7033533.12 - - - - r /T - � , - - - E s E= 2429121:98 sz , �n 3 +00 - I - i /T - 38 +00 � - - mil UNDER 01 UN RGRO TELEPHON _ TELEPHONE - - �� - -- - E E ARK O Lr) NOTES: N - - di 4 +00 T O 1. SEE DT -1 FOR RETAINING WALL _ w `I E T - 4 0 +00 AND CY C411 CONFIGURATION - - - A rK -- - - - - qe - - R 6 q la STA 38+85.24, 22,00'RT 94 93 Z INSTALL 25' SGT q' J 11 COM EA o - - STA 39 +08.24, 22.00'RT �- B 20 200 BEGIN TY C411 RAIL BEGIN RETAINING WALL �� \ - �® < se - TOP OF WALL = 497.21 BOTTOM OF WALL= 491.80 STA 39 +50, 22.00'LT PI RETAINING WALL N= 7033493,85 Q� 3 TOP OF WALL = 496.72 I E= 2429057.94 \ BOTTOM OF WALL = 491.72 ol STA 39 +08.24, 22.00'RT INSTALL (7L2) TRANSITION N= 703353520 E=2429105. 11 I I g3 " I I STA 41 +9585, 20.65LT micrAli Inv) meeinnnAl- MATCH PROPOSED BRIDGE RAIL I'yIb�1I END RETAINING WALL TOP OF WALL = 497.09 BOTTOM OF WALL= 49309 \ 1 N= 7033481.11 E= 2429380.64 I jI qti ' p q3 � m I �49� BRIDGE GRADING AND GUARDRAIL 1 " =20' i / / / i INSTALL 25" SGT STA 43 +83.93, 19.50 RT INSTALL (TL2) TRANSITION /IT_ - - f \ ` VV �O LUZ WU egg Ny �nNN - Via � F- I z 0 I- U J D x ry ~ U1 0 � Z � JD 0 W of 0 0 0 Z a J CD LEI Z W < M CD - � o IT 0 0 i i i ¢ M N N Q J m m N O o O C U C N m o c om L � COQ C D O N o, N fq Cy 3 (A � mV� �W O O Z U N N Q Q �}} K L z >o SHEET GR -1 00% SUBMITTAL SEQ. 14 OF 80 , / 495 STA 41 +98.40, 2200'RT PI RETAINING WALL TOP OF WALL= 498.19 BOTTOM OF WALL= 49216 7033478.86 / N= E= 2429351.98 / / / MATCH PROPOSED BRIDGE RAIL I'yIb�1I END RETAINING WALL TOP OF WALL = 497.09 BOTTOM OF WALL= 49309 \ 1 N= 7033481.11 E= 2429380.64 I jI qti ' p q3 � m I �49� BRIDGE GRADING AND GUARDRAIL 1 " =20' i / / / i INSTALL 25" SGT STA 43 +83.93, 19.50 RT INSTALL (TL2) TRANSITION /IT_ - - f \ ` VV �O LUZ WU egg Ny �nNN - Via � F- I z 0 I- U J D x ry ~ U1 0 � Z � JD 0 W of 0 0 0 Z a J CD LEI Z W < M CD - � o IT 0 0 i i i ¢ M N N Q J m m N O o O C U C N m o c om L � COQ C D O N o, N fq Cy 3 (A � mV� �W O O Z U N N Q Q �}} K L z >o SHEET GR -1 00% SUBMITTAL SEQ. 14 OF 80 ,