Sales Tax 09-CN110125CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Sales Tax 2009 Street Reconstruction Project Heartz Road (Tax 2009) CONTRACTOR: RKM Utilities OWNER: City of Coppell CHANGE ORDER NO.: One (1) DATE: January 21, 2011 Pagel of 2 1. This change allows for the installation of various utility stub -outs to serve a proposed residential development at the Southeast corner of Heartz and Sandy Lake. 2. This change order creates a pay item to address two 2 -inch water services that were not addressed in the bid schedule. 3. This change order provides for compensation to the contractor to change the height of the roadway crown from 8" to our standard 6" crown. 4. This change provides an additional pay item to relocate the school zone flasher for Manera Academy. Item Description ADD: 131A. 1" water service line — Short Service 126A. 21" Reinforced Concrete Pipe (Class III) 160A. Connect 21" RCP to existing 48" Storm 161A. 2" Irrigation Service 162A. 2" Domestic Service Quantity Unit Unit Price Total 3 EA $670.00 $2,010.00 18 LF $52.00 $936.00 I LS $1,000.00 $1,000.00 1 LS $2,100.00 $2,100.00 1 LS $2,700.00 $2,700.00 163A. Additional Excavation associated with reduced crown height. 164A. Relocate School Zone Flasher Total Additions: 1 LS $3,417.66 $3,417.66 1 LS $1,500.00 $1,500.00 $13,663.66 Previous contract amount $534,582.50 Net increase in contract amount $13,663.66 Revised contract amount $ 548,246.16 Cumulative increase in TOTAL change order amount (Percentage) 2.6% Net increase in contract time of completion 0 Revised C ontract time of completion 150 C Day The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. �r� f 1.215.11 - Date r d to by Contracto , Date Accepted y City D afe